Preventative Maintenance Inspection Form
DFU-0276-4r0_fmt_en-US
PM – 3/8
Setup:
To aid in testing the Synergy
RF
system, obtain an Apollo
RF®
Service probe, an Electrical Safety Analyzer,
and an Electrosurgical Analyzer.
A Calibrated Electrical Safety Analyzer will be required to complete the electrical safety test.
Procedure:
Indicate a PASS/Fail for each item. Any failure indicates that the device will need to be sent to Arthrex
for evaluation.
Visual Inspection
Initials Action
Pass/Fail
Visual Inspection: Visually inspect the Console and foot pedal to ensure that the
cables, connectors, contacts, and display are not damaged or worn. If fluid or
particles have splashed on the display, clean with a microfiber cloth by gently
wiping in a circular motion.
Preparation
Initials Action
Present/Not
Present
Make sure the Synergy
RF
Console screen appears when the AC main power
switch is activated
Connect Service Probe
Warnings
Initials Action
Present/Not
Present
Check that error messages are not present. [See Appendix]
Any error message need to be evaluated and corrected before moving forward with this Procedure.
Please see the Appendix at the end of this document for any error message that is displayed.
Summary of Contents for SynergyRF AR-9800
Page 2: ...Page i This page intentionally left blank ...
Page 26: ...Technical Specifications SynergyRF System Service Guide DFU 0276 4r0_fmt_en US Page 20 of 50 ...
Page 27: ...Technical Specifications SynergyRF System Service Guide DFU 0276 4r0_fmt_en US Page 21 of 50 ...
Page 28: ...Technical Specifications SynergyRF System Service Guide DFU 0276 4r0_fmt_en US Page 22 of 50 ...
Page 29: ...Technical Specifications SynergyRF System Service Guide DFU 0276 4r0_fmt_en US Page 23 of 50 ...
Page 30: ...Technical Specifications SynergyRF System Service Guide DFU 0276 4r0_fmt_en US Page 24 of 50 ...