The Foundation For Your Building
9
Foundation
BW9
Concrete Slab
The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The following are the recommended materials for your foundation.
●
2 x 4's (5cm x 10cm) (will be removed once the concrete cures)
●
Concrete
●
Sheet of 6 mil plastic
●
We recommend for a proper strength concrete to use a mix of:
1 part cement
●
3 parts pea sized gravel
●
2 1/2 parts clean sand
Prepare the Site/Construct a Foundation
1. Dig a square, 6" (15cm) deep into the ground (remove grass).
2. Fill up to 4" (10cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 2x4 (5cm x 10cm)
lumber.
5. Pour in concrete to fill in the hole and the frame giving a
total of 4" (8-10cm) thick concrete. Be sure surface is level.
Allow 3 - 5 hours for construction and a week for concrete curing time.
Note: Before beginning construction, check local building codes
regarding footings, location and other requirements.
141 1/8"
3,58m
FRONT (ROLL-UP DOOR)
10' - 111 3/4"
2,84m
17' - 198"
5,03m
24' - 284 1/4"
7,22m
31' - 370 1/2"
9,41m
Note: Finished Slab dimensions, with lumber removed.
Reinforcing
Rods
Reinforcing
Rods
Optional Footer Type of Foundation
Welded Wire
Fabric