
Salzburg TCBM-TCPW
English
05060207 00 03-2020
36
The loading-unloading operations must be performed by qualified personnel that are able to
verify weights, the exact points for lifting (without piping, cables, electrical panels, etc.) and
the most suitable means, both in terms of safety and lifting capacity.
The counters come with a frame-platform in wood fixed to the base for transport with forklifts:
Features of the
forklift
stacker crane
Use a forklift:
-
with suitable specifications in compliance with applicable standards
-
NOT
worn/damaged
-
manual or electrical suitable for lifting the counter, with a nominal capacity
greater than or equal to 1000 kg
-
with compliant and NON worn cables
Safe handling
(how to pro
-
ceed)
•
make sure there are no foreign objects within the handling area
•
always place the lifting brackets in the indicated points
•
always introduce the brackets completely
•
balance the weight of the counter so as to ensure that the load remains bal
-
anced (Fig.10)
WARNING! Heavy object. Crushing
Observe the indications regarding safe handling
Dragging. collapsing/distortion/tearing
DO
NOT drag/push the counter
DO
NOT use the glass panels for attachment/support/grip
Observe the indications regarding safe handling
i
DO
NOT use transportation procedures other than those indicated.
12.
Storage
Remedy
•
the counters must be stored indoors, with a temperature ranging between
-25°C and +55°C and a humidity between 30% and 90%.
• before storing the counters, check that the packing is intact and that it does
not display any defect that may compromise preservation of the counters.
What to avoid
UV rays. Permanent deformation of plastic materials /damage of coun
-
ter parts.
DO
NOT store the counters in uncovered areas exposed to atmospheric
agents and to direct sunlight.
13. Installation, environmental conditions, first cleaning
WARNING!
Before carrying out any procedures, take all possible precautions to prevent injury to the
operator, use the individual Personal Protection Equipment provided (chap. 3).
Installation is reserved to technicians trained and authorized by the body specified in the
contract (manufacturer/dealer/distributor)
i
-
It is the responsibility of the customer to provide the installation area
-
Changes to the setup described here must be authorized by ARNEG S.p.A.
The counter can be delivered packed as follows:
•
with frame in wood fixed to the base and nylon casing blocked by straps (standard) (Fig.4)
•
with a cardboard casing (on request) (Fig.5)
•
with wooden crate (on request) (Fig.6)