12.
Internal
Cabling
Guide
Armarac
provides
facility
to
install
and
correctly
manage
all
of
the
cabling
required
for
a
full
10RU
of
equipment.
To
avoid
excess
cable
clutter
we
recommend
using
cables
that
are
1.0m
to
1.5m
in
length
(3ft,
4ft,
5ft
long).
Note
due
to
the
nature
of
the
Vertiblade
articulated
hinging
system
all
cabling
is
required
to
run
on
the
left
‐
hand
side
of
the
enclosure
to
ensure
each
bracket
can
open
properly
for
full
device
access.
Step
1
–
Main
Power
Supply
If
used,
connect
the
chassis
power
outlet
to
your
UPS
inlet
or
power
distribution
unit
(PDU).
Do
not
turn
your
UPS
on
yet.
Step
2
–
Device
Power
Distribution
Continue
to
run
AC
power
cables
from
your
UPS
(or
PDU)
to
each
device
that
you
have
installed
in
the
Vertiblade
brackets.
For
each
device
open
its
Vertiblade
bracket
up
to
90
degrees
to
ensure
the
correct
length
and
positioning
of
the
cable.
Use
the
slots
at
the
bottom
of
each
Vertiblade
panel
to
cable
‐
tie
the
power
cables
in
to
position.
Once
all
of
the
cables
are
run,
group
them
in
to
looms
and
cable
‐
tie
to
the
transverse
cable
management
slots
across
each
Vertiblade.
Ensure
each
bracket,
one
by
one,
can
fully
open
without
pinching
or
pulling
the
cables.