Aqualisa Visage Installation Manual Download Page 6

Visage™ Digital Installation Guide  6

1

To ensure safe operation and installation of this product, the Quartz Smart Valve

™ 

MUST be 

installed in one of the orientations shown.

The Quartz Smart Valve™ MUST be sited in a position that is safely accessible for servicing 
and commissioning purposes. When fitted in a loft space, the route to and the area around 
the Quartz Smart Valve™ must be boarded to ensure a safe working environment.
The optimum position for the Quartz Smart Valve™ is in the roof space above the 
controller site to take full advantage of the ease and speed of installation.
The distance between the Quartz Smart Valve™ and the controller must be within the 
range of the 10m data cable supplied.

Isolation valves are supplied with the Quartz Smart Valve

 and 

must be fitted on both inlets and the blended water outlet. All 
pipe work should be run in 15mm pipe. All pipe work should be 
supported. For gravity fed installations, 22mm pipe work should 
be run as close to the Quartz Smart Valve

 as possible before 

reducing down to 15mm.

2

To ensure optimum performance we recommend using copper pipe with a minimum 
number of elbows. To minimise post shower dripping outlet pipework should have 
a gentle gradient rise away from the Quartz Smart Valve™. Special notes for plastic 
pipework, refer to the Important Information (Connections) section. 

The inlet supply centres are 48mm.
Please note arrow on isolation valve to indicate direction of flow.
DO NOT use compression fittings on the inlet and outlet spigots this will affect the 
warranty if fitted.

Choose the position for your Quartz Smart Valve

 as close to 

the controller as possible. The Quartz Smart Valve

 may be sited 

in the roof space above the proposed shower site, in the airing 
cupboard or behind a screwed bath panel if more convenient.  
For information regarding protecting the Quartz Smart Valve

 

from cold/frost, contact Aqualisa Customer Services or refer 
to the Aqualisa website. Insulation material must not be placed 
under or on top of the Quartz Smart Valve

, the location should 

be where freezing cannot occur.

Please refer to the system layout diagrams.

Exposed installation 

example shown

3

300 mm

210 mm

70 mm

300 mm

210 mm

QUARTZ

TM

 SMART VALVE AND DIVERTER

1

To ensure safe operation and installation of this product, the Quartz

TM

 smart valve and 

diverter MUST be installed in one of the orientations shown.

PLEASE NOTE: If installing a diverter please also note all areas marked with this symbol.

INSTALLATION

 

 

For installation with the diverter.

2

Isolation valves are supplied with the Quartz

TM

 smart valve and  

diverter valve and must be fitted on both inlets and the blended 
water outlet/ outlets. For optimum performance on gravity fed 
systems 22mm pipe work should be run as close to the Quartz

TM

 

smart valve as possible before reducing down to 15mm. All pipe 
work should be supported.

The inlet supply centres are 48mm. 

Please note arrow on isolation valve to indicate direction of flow. 

DO NOT use compression fittings on the inlet and outlet spigots this will affect the    

warranty if fitted. 

3

Choose the position for your 

Quartz

TM

 smart valve

 as close to the shower control as possible. 

The Quartz

TM

 smart valve may be sited in the roof space above the proposed shower site, in the 

airing cupboard or behind a screwed bath panel if more convenient. If siting in the roof space, 
ensure that freezing cannot occur and that no insulation material is placed under or over the 
Q

TM

 smart valve or diverter. Please refer to the system layout.

 

If installing a diverter, choose the position for the 

Quartz

TM

 smart valve 

as close to the  

diverter as possible, within the range of the 2m connecting data cable provided.

4

Place the Quartz

TM

 smart valve on a solid mounting surface, and 

place the fixing feet into suitable positions. Mark then drill and 
prepare suitable fixings before securing the Quartz

TM

 smart valve 

to the mounting surface using the screws provided, (if suitable).

 

If installing the diverter this also needs to be installed as per the 
above instructions in step 4

5

Flush through both hot and cold supply pipes.

The maximum hot water inlet temperature must be no more than 65˚C.

6

Attach the supply pipes to the Quartz

TM

 smart valve, ensuring that 

the cold and hot feeds are fitted into the appropriately marked 
inlets. 

Do not solder near to plastic components.

7

Prepare and connect a pipe from the mixed water outlet on the 
Quartz

TM

 smart valve through the wall to the proposed siting for 

the shower outlet.
Using pipe clips as appropriate, ensure that all pipe work is  

 

perpendicular to the Quartz

TM

 smart valve, i.e. not putting any 

strain on the fittings.

 

 If installing a diverter prepare and connect the pipe from the mixed water outlet on the Q

TM

 

smart valve through to the diverter inlet. The diverter can be fitted directly onto to the  
Q

TM

 smart valve outlet if required on the HP/Combi system installation. A cranked M/F elbow 

is supplied for the Gravity Pumped system for ease of installation. Refer to images in point 1. 

 

Ensure the isolation valves are connected to the diverter outlets with the arrows correctly 
aligned according to the direction of flow. Using pipe clips as appropriate, ensure that all pipe 
work is perpendicular to the Quartz

TM

 smart valve and diverter, i.e. not putting any str

ain on the fittings.

Prepare and connect the pipes from the diverter outlets to the proposed siting for the outlets.

To maximise flow rates we recommend using copper pipe with the minimum amount of 

elbows on all pipes leading to and from the Quartz

TM

 smart valve. 

Ensure the pipe work connections have been flushed through.
If fitting a bath outlet, a suitable non restrictive double check valve (not supplied) MUST be 

fitted to the blended outlet pipe in line with the current water regulations.

BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED, THE ELECTRICITY SUPPLY MUST BE 
TURNED OFF AT THE MAINS SWITCH.
ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED PERSON.

 

 

!

8

Unscrew the single fixing on top of the Quartz

TM

 smart valve and 

carefully tilt the lid up and off the location lugs and pull the lid clear. 

 

If installing the diverter also remove the lid following the 
instructions above in step 8.

9

As installation differs for different controls please refer to the relevant smart controller  
installation guide for the Quartz

TM

 smart valve and diverter wiring.

10

Connect the Quartz

TM

 smart valve power lead to a double pole 3 

amp fuse switched spur incorporated in the fixed wiring circuit, in 
accordance with current wiring rules. Ensure that this is located  
in an accessible, dry location and not in the bathroom. 

THIS APPLIANCE MUST BE EARTHED                                                     
We recommend protecting surface mounted cables in suitable approved conduit to avoid the risk of 
damage from vermin.
The power lead should also be clipped in place with ‘P’ clips or similar to avoid accidents.

 

 

!

11

The Q

TM

 smart valves are supplied factory set with the flow rate at 

either 

‘NORMAL HP’

 or 

‘NORMAL GRAVITY’

 mode depending on 

which  system has been ordered.

BALANCED HP SYSTEMS:

Standard Q

TM

 smart valves fitted to balanced high pressure sys-

tems may be set to ‘NORMAL HP’ or for water economy ‘ECO’ 
modes.  

STANDARD COMBINATION BOILER SYSTEMS:

For Standard Quartz

TM

 smart valves installed on combi boiler  

systems, for optimum performance we recommend setting to the 
‘COMBI’ mode.

The ‘ECO’ flow rate mode should NOT be selected for shower or bath systems fitted  

to combination boilers.

PUMPED QUARTZ

TM  

SMART VALVE:                                                                                         

Pumped Quartz

TM

 smart valves are fitted to gravity systems may be set to ‘NORMAL 

GRAVITY’ or for water economy ‘ECO’ modes.  

When making any adjustment to the Quartz

TM

 smart valve settings the power must    

be isolated.

12

Run the shower at maximum temperature (factory pre set to 
45ºC). If required, maximum temperature adjustment can be 
made with a flat bladed screwdriver using the 

‘MAX TEMP 

ADJUSTMENT’ 

control as indicated. When the temperature 

has been set to the desired position, carefully replace the 
Quartz

TM

 smart valve lid and secure the fixing screw, hand 

tight only.

Site conditions can affect temperature settings, installer to adjust as required.

All copper pipe work must be cross-bonded and connected to a reliable earthing point.

13

Please refer to the separate Q

TM

 controller installation guide to complete installation. 

Quartz

TM

 smart valve connected 

directly to diverter valve

Quartz

TM

 smart valve connected to 

diverter with additional pipe 

Quartz

TM

 smart valve connected 

directly to diverter valve

Quartz

TM

 smart valve connected 

to diverter with additional pipe 

HP/Combi Quartz

TM

 smart valve

Gravity pumped Quartz

TM

 smart valve

This product must be installed by a competent person in accordance with the relevant  

current Water Supply Regulations.
In addition to the guide below it is essential that the written instructions overleaf are read 

and understood and that you have all the necessary components (shown bottom right)  

before commencing installation. 
The Quartz

TM

 smart valves are supplied with universal fixings intended to secure it to a  

solid mounting surface.

 

 

!

 

 

!

The Quartz

TM

 smart valve and diverter must be sited in a position that is safely accesible  

for servicing and commissioning purposes. When fitted in the loft space, the route to and 

the area around the Quartz

TM

 smart valve must be boarded to ensure a safe working  

environment. 
The optimum position for the Quartz

TM

 smart valve and diverter is in the roof space above 

the Q

TM

 controller site to take full advantage of the ease and speed of installation.

The distance between the Quartz

TM

 smart valve and main Q

TM

 controller must be within the 

range of the 10m data cable supplied. 
The diverter inlet has been designed to enable connection directly inline with the HP/

Combi Quartz

TM

 smart valve outlet isolation valve connection or off the Gravity Pumped 

Quartz

TM

 smart valve outlet using the cranked M/F elbow connection fitting.

 ). .

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

Single outlet

Components (Gravity pumped)

Components (HP/Combi)

Components (Gravity pumped)

Components (HP/Combi)

Single outlet

With diverter

With diverter

265mm

70mm

350mm

270mm

445mm

445mm

270mm

Max 2m

Max 2m

197mm

240mm

70mm

210 mm

450 mm

QU
ARTZ

TM

 SMART V

AL

VE AND DIVERTER

1

To ensur

e sa
fe oper

ation and installation o

f this pr

oduct, 

the Q

uartz

TM

 smart v

alv

e and 

div

erter

 M

UST be installed in one o

f the orien

tations sho

wn.

PLEASE

 NO
TE: I
f installing a div

erter

 please also no

te all ar

eas mark

ed with 

this s

ymbol.

INST
ALL
ATION

 

 

For

 installation with 

the div

erter

.

2

Isolation v

alv

es ar

e supplied with 

the Q

uartz

TM

 smart v

alv

e and 

 

div

erter

 v

alv

e and must be fitted on bo

th inlets and 

the blended 

w

ater
 outlet/ outlets. F

or

 op
timum perf

ormanc

e on gr

av

ity

 fed 

sy

stems 22mm pipe w

ork should be run as close 

to 

the Q

uartz

TM

 

smart v

alv

e as possible bef

or

e r

educing do

wn 
to 15mm. All pipe 

w

ork should be supported.

The inlet supply

 c

en

tr

es ar

e 48mm. 

Please no

te arr

ow on isolation v

alv

to indicate dir

ection o

f flo
w

DO NO

T use c

ompr

ession fittings on 

the inlet and outlet spigo

ts 

this will aff

ect 
the 
  

w

arr

an

ty

 if fitted. 

3

Choose 

the position 

for

 y

our
 

Q

uartz

TM

 smart v

alv

e

 as close 

to 

the sho

w

er

 c

on

tr

ol as possible. 

The Q
uartz

TM

 smart v

alv

e ma

y be sited in 

the r

oo

f spac

e abo

ve 

the pr

oposed sho

w

er

 site, in 

the 

airing cupboar

d or
 behind a scr

ew

ed bath panel if mor

e c

on

venien

t. I

f siting in 

the r

oo

f spac

e, 

ensur

that 

fr

eezing canno

t oc
cur
 and 

that no insulation material is plac

ed under

 or

 o

ver

 the 

Q

TM

 smart v

alv

e or
 div
erter

. Please r

ef

er

 to 

the s

ystem la

yout.

 

If installing a div

erter

, choose 

the position 

for

 the 

Q

uartz

TM

 smart v

alv

as close 

to 

the 
 

div

erter

 as possible, within 

the r

ange o

f the 2m c

onnecting data cable pr

ov

ided.

4

Plac

the Q

uartz

TM

 smart v

alv

e on a solid moun

ting surf

ac

e, and 

plac

the fixing 

feet in

to suitable positions. Mark 

then drill and 

pr

epar
e suitable fixings bef

or

e securing 

the Q

uartz

TM

 smart v

alv

to 

the moun

ting surf

ac

e using 

the scr

ews pr

ov

ided, (if suitable

).

 

If installing 

the div

erter

 this also needs 

to be installed as per

 the 

abo
ve instructions in step 4

5

Flush 
thr

ough bo

th ho

t and c

old supply

 pipes.

The maximum ho

t w

ater
 inlet 

temper

atur
e must be no mor

than 65˚C.

6

Attach 

the supply

 pipes 

to 

the Q

uartz

TM

 smart v

alv

e, ensuring 

that 

the c

old and ho

t f

eeds ar

e fitted in

to 

the appr

opriately

 mark

ed 

inlets. 

D

o no
t solder

 near

 to plastic c

omponen

ts.

7

Pr

epar
e and c

onnect a pipe 

fr

om 
the mix

ed w

ater
 outlet on 

the 

Q

uartz

TM

 smart v

alv

thr

ough 

the w

all 

to 

the pr

oposed siting 

for

 

the sho

w

er

 outlet.

U

sing pipe clips as appr

opriate, ensur

that all pipe w

ork is 

  

perpendicular

 to 

the Q

uartz

TM

 smart v

alv

e, i.e. no

t putting an

str

ain on 

the fittings.

 

 If installing a div

erter

 pr

epar
e and c

onnect 

the pipe 

fr

om 
the mix

ed w

ater
 outlet on 

the Q

TM

 

smart v

alv

thr

ough 

to 

the div

erter

 inlet. 

The div

erter

 can be fitted dir

ectly

 on
to 

to 

the 
 

Q

TM

 smart v

alv

e outlet if r

equir

ed on 

the HP

/C

ombi s

ystem installation. A cr

ank
ed M/F elbo

is supplied 

for

 the G

rav

ity

 P

umped s

ystem 

for

 ease o

f installation. R

ef

er

 to images in poin

t 1. 

 

Ensur

the isolation v

alv

es ar

e c

onnected 

to 

the div

erter

 outlets with 

the arr

ows c
orr
ectly

 

aligned ac

cor

ding 

to 

the dir

ection o

f flo
w

. U

sing pipe clips as appr

opriate, ensur

that all pipe 

w

ork is perpendicular

 to 

the Q

uartz

TM

 smart v

alv

e and div

erter

, i.e. no

t putting an

y str

ain on 

the fittings.

Pr

epar
e and c

onnect 

the pipes 

fr

om 
the div

erter

 outlets 

to 

the pr

oposed siting 

for

 the outlets.

To maximise flo

w r

ates w

e r

ec

ommend using c

opper

 pipe with 

the minimum amoun

t o

elbo
ws on all pipes leading 

to and fr

om 
the Q

uartz

TM

 smart v

alv

e. 

Ensur

the pipe w

ork c

onnections ha

ve been flushed 

thr

ough.

If fitting a bath outlet, a suitable non r

estrictiv

e double check v

alv

e (no

t supplied) M

UST be 

fitted 

to 

the blended outlet pipe in line with 

the curr

en

t w

ater
 regulations.

BEF
ORE

 ANY
 ELE
CTRICAL

 AD
JUST

MENT

 IS

 A

TTEMPTED

, THE
 ELE
CTRICITY

 SUPPL

Y M

UST
 BE

 

TURNED

 OFF
 A

T THE
 MAINS

 SWIT

CH
.

ELE
CTRICAL INST

ALLA

TION

 M

AY

 ONL
Y BE

 CARRIED

 OUT
 BY

 A QU

ALIFIED PERSON.

 

 

!

8

U

nscr
ew 
the single fixing on 

top o

f the Q

uartz

TM

 smart v

alv

e and 

car
efully

 tilt 
the lid up and o

ff 

the location lugs and pull 

the lid clear

 

If installing 

the div

erter

 also r

emo
ve 

the lid 

follo
wing 

the 

instructions abo

ve in step 8.

9

As installation diff

ers 
for

 diff
er

en

t c

on

tr

ols please r

ef

er

 to 

the r

ele

van

t smart c

on

tr

oller
  

installation guide 

for

 the Q

uartz

TM

 smart v

alv

e and div

erter

 wiring.

10

C

onnect 

the Q

uartz

TM

 smart v

alv

e po
w

er

 lead 

to a double pole 3 

amp 

fuse s

witched spur

 inc
orpor

ated in 

the fix

ed wiring cir

cuit, in 

ac

cor

danc

e with curr

en

t wiring rules. E

nsur

that 

this is located 

 

in an ac

cessible, dry

 location and no

t in 
the bathr

oom. 

THIS APPLIANCE M

UST BE EAR

THED                                                     

W

e r

ec

ommend pr

otecting surf

ac

e moun

ted cables in suitable appr

ov

ed c
onduit 

to a
void 
the risk o

damage 

fr

om v

ermin.

The po

w

er

 lead should also be clipped in plac

e with ‘P’ clips or

 similar

 to a
void ac

ciden

ts.

 

 

!

11

The Q

TM

 smart v

alv

es ar

e supplied 

factory

 set with 

the flo

w r
ate at 

either

 

‘NORMAL HP’

 or

 

‘NORMAL GRA

VITY’

 mode depending on 

which  s

ystem has been or

der
ed.

BALANCED HP S

YSTEMS:

Standar

d Q

TM

 smart v

alv

es fitted 

to balanc

ed high pr

essur

e s

ys-

tems ma

y be set 

to ‘NORMAL HP’ or

 for

 w

ater
 ec

onom

y ‘E

C

O’ 

modes.  

ST

AND

ARD C

O

MBINA

TION BOILER S

YSTEMS:

For

 S

tandar

d Q
uartz

TM

 smart v

alv

es installed on c

ombi boiler

  

sy

stems, 

for

 op
timum perf

ormanc

e w
e r

ec

ommend setting 

to 

the 

‘C

O

MBI’ mode.

The ‘E
C

O’ flo

w r

ate mode should NO

T be selected f

or

 sho
w

er

 or

 bath s

ystems fitted 

 

to c
ombination boilers.

PU

MPED QU

ARTZ

TM  

SMART V

AL

VE:                                                                                        

 

Pumped Q

uartz

TM

 smart v

alv

es ar

e fitted 

to gr

avity
 sy

stems ma

y be set 

to ‘NORMAL 

GRA
VITY’ or

 for

 w

ater
 ec

onom

y ‘E

C

O’ modes.  

When making an

y adjustmen

t to 

the Q

uartz

TM

 smart v

alv

e settings 

the po

w

er

 must 

  

be isolated.

12

Run 

the sho

w

er

 at maximum 

temper

atur
e (

factory

 pr

e set 

to 

45ºC). I

f r

equir

ed, maximum 

temper

atur
e adjustmen

t can be 

made with a flat bladed scr

ew

driv
er

 using 

the 

‘MAX 

TEMP 

AD
JUST

MENT’ 

con

tr

ol as indicated. When 

the 
temper

atur

has been set 

to 

the desir

ed position, car

efully

 replac

the 

Q

uartz

TM

 smart v

alv

e lid and secur

the fixing scr

ew

, hand 

tigh
t only

.

Site c
onditions can aff

ect 
temper

atur
e settings, installer

 to adjust as r

equir

ed.

All c

opper

 pipe w

ork must be cr

oss-bonded and c

onnected 

to a r

eliable earthing poin

t.

13

Please r

ef

er

 to 

the separ

ate Q

TM

 c

on

tr

oller
 installation guide 

to c
omplete installation.

 

Q

uartz

TM

 smart v

alv

e c

onnected 

dir

ectly

 to div

erter

 v

alv

e

Q

uartz

TM

 smart v

alv

e c

onnected 

to 

div

erter

 with additional pipe 

Q

uartz

TM

 smart v

alv

e c

onnected 

dir

ectly

 to div

erter

 v

alv

e

Q

uartz

TM

 smart v

alv

e c

onnected 

to div

erter

 with additional pipe 

HP

/C

ombi Q

uartz

TM

 smart v

alv

e

G

ravity
 pumped Q

uartz

TM

 smart v

alv

e

This pr

oduct must be installed b

y a c
ompeten

t person in ac

cor

danc

e with 

the r

ele

van

t  

curr
en

t W
ater
 S

upply

 R

egulations.

In addition 

to 

the guide belo

w it is essen

tial 
that 

the written instructions o

verleaf ar

e r

ead 

and understood and 

that y

ou ha

ve all 
the nec

essary

 c

omponen

ts (sho

wn bo

ttom righ

t) 

 

bef
or

e c

ommencing installation. 

The Q
uartz

TM

 smart v

alv

es ar

e supplied with univ

ersal fixings in

tended 

to secur

e it 
to a 
 

solid moun

ting surf

ac

e.

 

 

!

 

 

!

The Q
uartz

TM

 smart v

alv

e and div

erter

 must be sited in a position 

that is saf

ely

 ac

cesible 

 

for

 servicing and c

ommissioning purposes. When fitted in 

the lo

ft spac

e, 

the r

oute 

to and 

the ar

ea ar

ound 

the Q

uartz

TM

 smart v

alv

e must be boar

ded 
to ensur

e a saf

e w
orking 

 

en

vir

onmen

t. 

The op

timum position f

or

 the Q

uartz

TM

 smart v

alv

e and div

erter

 is in 

the r

oo

f spac

e abo

ve 

the Q

TM

 c

on

tr

oller
 site 

to 

tak

e full adv

an

tage o

f the ease and speed o

f installation.

The distanc

e betw

een 
the Q

uartz

TM

 smart v

alv

e and main Q

TM

 c

on

tr

oller
 must be within 

the 

range o

f the 10m data cable supplied. 

The div

erter

 inlet has been designed 

to enable c

onnection dir

ectly

 inline with 

the HP

/

C

ombi Q

uartz

TM

 smart v

alv

e outlet isolation v

alv

e c

onnection or

 o

ff 

the G

ravity
 P

umped 

Q

uartz

TM

 smart v

alv

e outlet using 

the cr

ank
ed M/F elbo

w c
onnection fitting.

 ) . .

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

Single outlet

C

omponen

ts (
G

ravity
 pumped)

C

omponen

ts (HP

/C

ombi)

C

omponen

ts (
G

ravity
 pumped)

C

omponen

ts (HP

/C

ombi)

Single outlet

With div

erter

With div

erter

265mm

70mm

350mm

270mm

445mm

445mm

270mm

Max 2m

Max 2m

197mm

240mm

70mm

450 mm

210 mm

70 mm

Summary of Contents for Visage

Page 1: ...VISAGE DIGITAL INSTALLATION GUIDE...

Page 2: ...de 2 CONCEALED COMPONENTS 1 2 EXPOSED COMPONENTS 1 1 Gravity stored water systems only 2 Mains fed and separately pumped water systems only 2 1 Gravity stored water systems only 2 Mains fed and separa...

Page 3: ...ituations where the ambient temperature is likely to fall below 5 C or rise above 40 C We do not recommend the use of a controller in steam therapy facilities This appliance must be earthed Cables mus...

Page 4: ...ED PUMP Shower Heads The range of shower heads has been designed for use with Smart systems Installation of any shower heads other than these may result in poor shower performance If at any stage duri...

Page 5: ...sited it may interfere with digital TV reception Please follow the recommendations below to minimise this effect See recommended layouts below Images of Quartz Smart Valve for illustration only refer...

Page 6: ...operation and installation of this product the Quartz diverter MUST be installed in one of the orientations shown PLEASE NOTE If installing a diverter please also note all areas ma For installation wi...

Page 7: ...e to the mounting surface using the screws provided if suitable 4 Attach the supply pipes to the Quartz Smart Valve ensuring that the cold and hot feeds are fitted into the appropriately marked inlets...

Page 8: ...ign the screws used must be non corrosive Power supply to the Quartz Smart Valve must be switched off before connecting or removing the controller Unscrew the two front cover fixings at the base of th...

Page 9: ...le plug into the back of the controller ensuring both rubber skirts are recessed into the connection see diagram below using a blunt flat bladed screwdriver or similar tool if required To make a water...

Page 10: ...truction please ensure the entry hole is neat and unobtrusive otherwise the inner tube could be visible within the showering area Remove ceiling plate if required DO NOT use a compression fitting or s...

Page 11: ...acket over the rail and support pillar and mark the fixing points Remove the fixing bracket and drill and prepare the fixing points using the fixings provided if suitable Secure the bracket to the wal...

Page 12: ...kirts are recessed into the connection see diagram below using a blunt flat bladed screwdriver or similar tool if required To make a water tight fitting ensure the rubber seal is no longer visible 12...

Page 13: ...hat these are located in an accessible dry location and not in the bathroom 1 THIS APPLIANCE MUST BE EARTHED We recommend protecting surface mounted cables in suitable approved conduit to avoid the ri...

Page 14: ...default Standard Quartz Smart Valve Combi Factory default will be Normal HP this setting must be changed to Combi for temperature stability and optimum performance Balanced High Pressure Standard Quar...

Page 15: ...allation Guide 15 Wiring Diagram Single Outlet BLENDED WATER COLD HOT 3AMP FUSED ELECTRICAL CONNECTION 10m CABLE 10m CABLE CONTROLLER WIRED REMOTE supplied separately Cables must be run in conduit or...

Page 16: ...lve Using a flat bladed screwdriver adjust the MAX TEMP ADJUSTMENT control as indicated When the temperature has been set to the desired position carefully replace the Quartz Smart Valve lid and secur...

Page 17: ...spacer fitting 2 Trim the projecting pipe to a length of 15 22mm measured from the face of the gripper ring using a suitable cutter If a hacksaw is used the pipe end must be carefully de burred and c...

Page 18: ...he single release button of the handset holder and slide onto the rail assembly 11 Carefully slide the gel hook onto the rail under the handset holder 12 Secure the top rail bracket into position on t...

Page 19: ...must be passed through the gel hook which has been designed to be utilised as a hose restraint Disengage the pivot clip and remove the pivot from the bottom of the handset Ensure the hose washer is in...

Page 20: ...e Supply Hot water cylinder Connect A or B Cold feed to cylinder B A NB THE BASE OF THE AQUALISA SMARTVALVETM MUST BE SITED NO HIGHER THAN THE BASE LEVEL OF THE CISTERN Central heating boiler Supply U...

Page 21: ...max Controller 10m max 10m max Controller Underside of cistern Supply Pressure reducing valve if required Central heating boiler Supply Supply Underside of cistern Hot water cylinder Cold feed to cyli...

Page 22: ...e temperature dial to the required setting 1 Press the Start Stop button on the controller to turn the shower on 2 The temperature may be adjusted whilst in the shower 4 The LED display will flash unt...

Page 23: ...reduce the need for chemical descaling in hard water areas your shower head incorporates a clear flow system whereby any scale build up can be broken down by gently rubbing the flexible tips of the j...

Page 24: ...the dial towards the hottest setting Isolate hot and cold feeds to the Quartz Smart Valve disconnect from the inlet spigots and then using the isolation valve bleed through the hot and cold supplies R...

Page 25: ...on Logic Module of Quartz Smart Valve If hot water supply is from a combination boiler the Logic module mode MUST be set to COMBI Airlock in water supplies for gravity fed systems only See Air lock in...

Page 26: ...es enquiries 01 864 3363 Service enquiries 01 844 3212 Aqualisa International Jan Palfijnstraat 26 002 Kortrijk Belgium 8500 Part No 705521 Issue 01 Mar 21 Please note that calls may be recorded for t...

Reviews: