10
5
Ensuring the black protective cap remains fitted, set the temperature control lever to the full cold (9 o’clock)
position. Remove the fixing screws, pull the assembly clear and set aside.
6
The temperature preset override ring (coloured) and the temperature preset location
ring (white) do not need to be removed for installation. If they are removed however,
please take note of the orientation prior to removal.
7
Carefully remove the shroud from the valve assembly. The temperature override
housing (white) does not need to be removed in order for the valve to be installed.
If the housing is removed then please take note of its orientation on the valve.
8
Fit the elbows to the body hand tight, ensuring that the rubber washers are correctly engaged (these are
supplied in the screw pack).
9
If the valve is to be installed for use with a gas fired instantaneous (multipoint)
water heater or a combination boiler the cold water flow regulator must be fitted
at this stage by insertion into the cold water port as shown ensuring the o’ring faces
the incoming flow (the flow regulator is supplied in its own pack).
10
The Dream valve is supplied with an outlet cap on the bottom of the valve allowing for a top outlet
connection. The bottom outlet can be used by simply removing the cap and repositioning it on the
top outlet. If the cap is removed please ensure that when replaced the washer in the cap is in place
and that the cap is done up tight.
11
Fit the outlet connector ensuring that the rubber washer is correctly engaged
(supplied in the screw pack), on the required outlet ensuring a tight fit. Position the
valve and check the four fixing positions and that there is adequate space available
around both inlet elbows and the outlet connector. Prepare the wall fixings as
required. Secure the valve assembly to the fixing surface using the screws
provided (if suitable).
Dream installation guide:Dolphin install Guide 18/1/11 09:59 Page 10