11
12
Using a silicone-based lubricant, lubricate the supply pipe ends and whilst
supporting the elbows push home the supply pipes ensuring the correct orientation
for the inlet pipes (HOT left and COLD right as shown on the valve). Push the valve
fully home until a definite stop is reached. Tube insertion depth is 25mm (1”).
13
Using a suitable tool, tighten both the elbow nuts and the outlet connector nut until water tight.
14
The installation should now be checked for leaks. Cap off the outlet assembly.
Loosely fit the on/off lever assembly and turn it fully clockwise to ensure that the
valve is fully turned off.
!
The on/off shaft is manufactured with a flat area. The corresponding flat
area in the on/off lever must be in alignment before the knob can be fitted.
15
Turn on the supply and check for any leaks upstream of the valve. Slowly open the control and check for
leaks downstream of the valve. If all is sound, again turn the on/off control fully clockwise and turn off
the supply.
17
Refit the temperature preset override ring (coloured) and the temperature preset
location ring (white) if removed prior to installation, taking care to fit the override
ring in the correct orientation as outlined in step 6.
Before replacing the shroud ensure that the shroud seal is in the correct position
as shown.
16
Place the mortar guard around the valve and fill in the chase. Once the in-filling
material has set, carefully remove the polystyrene to expose the valve body.
!
THE MORTAR GUARD MUST BE USED
Shroud seal
Shroud support ring
18
Replace the shroud ensuring that it is fully fitted against the shroud support ring
as shown.
Dream installation guide:Dolphin install Guide 18/1/11 09:59 Page 11