12
19
Using a silicone-based lubricant, petroleum jelly or liquid soap, lubricate the wall
plate seal. Apply a thin bead of silicone mastic into the groove on the rear of the
wall plate and carefully push the wall plate into position ensuring correct horizontal
alignment of the Aqualisa logo.
20
Ensuring the red spacer ring is correctly fitted inside the temperature lever assembly,
offer the lever assembly onto the valve, with the lever in the full cold (9 o’clock)
position. Secure using the temperature lever screws hand tight only.
21
Refit the on/off knob onto the valve ensuring the correct alignment with the shaft as
detailed in step 14. Using the grub screw and hexagonal key provided, secure the knob
to the valve.
22
Secure the lever to the on/off knob assembly.
23
Remove the protective caps from the on/off and temperature levers.
Adjustable Harmony head installation
1
Prepare pipework from the shower valve to the required position for the hose outlet
using a Ø15mm copper pipe. Slide the wall spacer down the projecting pipe flush with
the finished wall surface.
Dream installation guide:Dolphin install Guide 18/1/11 09:51 Page 12