Copyright © 2021 Aqua Creek Products All Rights Reserved
Revised 5/28/21
CONTROL BOX
AND BRACKET
#10 X 3/8
SOCKET HEAD (2)
STEP 1
Assembly Instructions
TOOLS REQUIRED:
9/16” WRENCH (2)
5/32” HEX KEY
The Power EZ 2 Pool Lift arrives with the boom arm
attached to the mast. To complete the assembly, layout all
parts on a large, clean area.
STEP 1.
Attach the control box to the lifts mast using the
supplied #10 socket head screws and a 5/32” hex key.
STEP 2.
Using two (2) 9/16” wrenches, connect the lower
end of the linear actuator to the mast (vertical post) with
one (1) 3/8” x 1 3/4” hex bolt, two (2) 3/8” fl at washers and
one (1) 3/8” nylock nut.
STEP 3.
Connect the upper end of the actuator to the
boom arm with one (1) 3/8” x 1 3/4” hex bolt, two (2) 3/8” fl at
washers and one (1) 3/8” nylock nut using the two (2) 9/16”
wrenches.
STEP 4.
Slide the lift into the previously installed anchor
socket. Make sure that the mast is seated at the bottom of
the anchor. Check to ensure easy rotation of the lift inside
the nylon-lined anchor sleeve.
3/8" X 1 3/4"
HEX BOLT
3/8" FLAT
WASHER (2)
3/8" NYLOCK
MAST
ACTUATOR
STEP 2
3/8 X 1 3/4
HEX BOLT
3/8 FLAT
WASHER (2)
3/8"
NYLOCK
STEP 3
6