background image

Copyright © 2021 Aqua Creek Products All Rights Reserved

Revised 5/28/21

 

1

Corr

main

corro

elim

main

Insp

a

b

c

d

e

f

g

h

i

j

k

l

NOT

1.

 

Overall V

osion is com

ntenance an

osion cause

inated and/

ntenance ins

ection Item 

a.

 

Anchor b

concrete

b.

 

The fixing

c.

 

Powder c

condition

on the cl

d.

 

Welded J

compone

e.

 

Hardwar

f.

 

All wiring

g.

 

All produ

h.

 

Plastic se

shape.   

.

 

Arm rest

arms.   

.

 

Electroni

recomme

k.

 

Inspect r

gear and

.

 

Inspect li

materials

fatigue o

TES/RECOMM

Visual Inspec

mmon with a

d cleaning w

d pitting, cra

/or minimize

structions.  M

bolts, concre

e, missing ha

g anchor is i

coated comp

n.  Clean and

eaned and r

Joints show 

ents 

e is present,

g routing clip

uct warning 

eat, foot rest

 hand grips a

ic and Lift co

ended for ou

otation gear

 alignment t

ift slings, sea

s for damage

or damage.   

MENDATION

A

ction 

nything in a

will prevent m

acking, thin

ed through a

Make comm

ete around a

rdware, and

nstalled cor

ponents are 

d repair any 

repaired finis

no signs of c

, secure, and

ps are prese

labels are pr

t, and other 

are present,

overs are pre

utdoor insta

rs for any da

to ensure pr

at belts, and

e, fatigue, an

NS:

 

Aqua Cr

 swimming p

most instanc

ning of the b

a thorough c

ents and/or

nchors, etc…

d anchors are

rectly and is

clean, corro

missing pow

sh. 

cracks or fat

d not corrod

nt and in go

resent and le

plastic com

, in good con

esent and in 

llations).   

amage or mi

oper rotatio

 other simila

nd/or deteri

reek Pro

pool environ

ces of corros

base metal, 

cleaning.

  Re

r recommend

… are in good

e installed c

s in good con

osion free, a

wder coat fin

tigue.  Repla

ded (bolts, nu

od condition

egible.   

ponents are

ndition, and 

good condit

ssing teeth. 

on of the lift.

ar stitched a

ioration.  Re

oducts A

INS

nment; even

sion.  

Replac

or other ins

efer to prod

dations in th

d condition.

orrectly.   

ndition. 

nd in good o

nish.  Apply a

ce any non‐c

uts, bushing

n.  

e present and

are well sec

tion (Lift cov

Inspect rota

.   

and webbed 

place at first

Annual 

SPECT

n stainless st

ce any comp

stances of co

uct manual 

he notes are

 No cracks in

overall 

a coat of wa

compliant 

gs, etc…).   

d in good 

cured to the 

vers are high

ation motor 

or weaved 

t sign of any

Pool Lif

TION

 

RE

 

eel.  Proper 

ponents that

orrosion tha

for addition

a below eac

Pass 

n   

 

 

 

 

 

 

 

 

hly   

 

 

ft Safety

EPORT

Page 

2

 of 

4

 

 

and regular

t have 

at can’t be 

al 

ch section. 

Fail  N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

y  

T

 

4

 

14

Summary of Contents for Power EZ 2

Page 1: ...lift with a dry pool Check entire box and all packing materials for parts Before beginning assembly read the instructions and identify parts using the gures and parts listed in this document It is cri...

Page 2: ...BLY SLING BAR 4 IN SLING HANDSET CONTROL BATTERY CHARGER QTY DESCRIPTION 1 24V LINAK CONTROL BOX 1 24V LINAK BATTERY CHARGER 1 LINAK HANDSET REMOTE 1 24V BATTERY 1 EZ SLING 1 EZ CHAIN SET 1 EZ HANGER...

Page 3: ...modate another person 2 Locate the concrete anchor socket Be careful to not lose the protective cap on the anchor as this will be used to keep dirt and debris out of the socket when the lift is not in...

Page 4: ...equivalent prior to inserting the anchor As you insert the anchor rotate it back and forth so that you can evenly distribute the cement or epoxy around the anchor 8 Once anchor is level and flush with...

Page 5: ...an accommodate another person 2 Locate the concrete anchor socket Be careful to not lose the protective cap on the anchor as this will be used to keep dirt and debris out of the socket when the lift i...

Page 6: ...es connect the lower end of the linear actuator to the mast vertical post with one 1 3 8 x 1 3 4 hex bolt two 2 3 8 flat washers and one 1 3 8 nylock nut STEP 3 Connect the upper end of the actuator t...

Page 7: ...the 1 4 button head lock and flat washer Mount the FULLY CHARGED 24V battery on top of the control box When properly mounted the battery will lock in place causing a click sound and will sit flush and...

Page 8: ...engage the brakes on the wheelchair 2 With the user facing the assistant gently slide the mesh seat sling under the seated user while still in the wheelchair 3 Attach the chain to the mesh sling and...

Page 9: ...The cord plug is ush with or sticking out of the outlet Properly Inserted The cord plug is recessed into the outlet POP The Charger is ON when the green light is glowing The Battery is CHARGING when...

Page 10: ...eded ProperCareofPool SpaLifts PROPER CARE NOTES Use only fresh water to wash your lift Do not wash with pool water Use only clean soft non abrasive cloths on your lift Do not store lift in pump room...

Page 11: ...16 19 1 BRB SS 1216 4 BUSHING BRONZE SLEEVE 3 8 X 1 2 X 1 4 20 1 F UBC BATTERY COVER 21 2 SQR 2 10 14 2X2 SQUARE BLACK CAP 22 2 BSH 10 X 3 8 BOLT 316 SS 10 24 X 3 8 SHCS 23 1 WF 10 WASHER FLAT 10 SAE...

Page 12: ...iption of the product its serial number the dates of purchase and installation and the exact nature of the defect Within thirty 30 days after receipt of a written warranty claim by Aqua Creek and barr...

Page 13: ...rating a p hooting and C002 and an component ce immediat dden inconsi ce any lift th s have been reek Pro For Tol Int ps aquacre lead to actu e product op oad before e aracteristics used For exa r or...

Page 14: ...for any da to ensure pr at belts and e fatigue an NS Aqua Cr swimming p most instanc ning of the b a thorough c ents and or nchors etc d anchors are rectly and is clean corro missing pow sh cracks or...

Page 15: ...con the lift is no attery on th battery cha is helpful A ake commen of damage an prevent corr OT IN USE ed on contr he voltage o Note Vito b tinuity throu e of the actu self if applic known good d up...

Page 16: ...thou ht to test th on connected e lift is funct on stalled corre anything lik 0 degrees ov NS Aqua Cr uired when d ut a load prio e lifts functi operate the tioning corre ectly is the li e a wall rail...

Reviews: