background image

Copyright © 2021 Aqua Creek Products All Rights Reserved

Revised 5/28/21

Anchor Installation: Retro-Fit Concrete

NOTE:  The concrete deck around the 
anchor should be a minimum of 8 inches 
thick and reinforced with #4 bars at 10 
inches on center, each way.  The total 
concrete pad area should be at least 60 
inches wide and 60 inches long.

 

 

TOOLS REQUIRED:

TAPE MEASURE 

 

4” CORE DRILL BIT

CORE DRILL   

 

FELT TIP MARKING PEN

ELECTRICAL TAPE   

VACCUM OR COMPRESSED AIR

CARPENTERS LEVEL  

2-PART EPOXY (or equivalent) 

1.

 

Determine the best location for the lift.  Mount the lift at a location that provides 42 inches [107cm] to 

48 inches [122cm] deck level to the bottom of the pool (usually the shallow end).  Make sure the location 
has enough clear deck space to easily transfer.  The lift requires at least 6 feet [1.8 meters] of unobstructed 
deck to each side of the lift to accommodate easy maneuvering of the lift over the water and back.  Keep 
in mind this lift will require assistance so locate an area that can accommodate another person.  

2.

  Locate the concrete anchor socket.  Be careful to not lose the protective cap on the anchor as this will 

be used to keep dirt and debris out of the socket when the lift is not installed in the anchor.

3.

  The setback to the center of the anchor must be no less than 12 inches [30.5cm] and no more than 

20 inches [51cm] from the pool wall.  The anchor location must also be at least 6 inches [15cm] from any 
control joint or edge of concrete slab.  Measure the location out using the tape measure and marking 
pen.  See FIGURE 1 on page 4 for details.

4.

  Core drill at least a 4 inch [10cm] diameter hole at the desired location for the lift anchor socket.  

The hole will need to be 7 inches [18cm] deep to allow for the grounding lug which protrudes from the 
bottom of the anchor.
 

NOTE: Use the electrical tape to make a mark on your drill bit at 7 inches [18cm] as a depth mark to

 

             tell you when to stop drilling.

5.

  Clean out the hole using a vacuum or compressed air.  Check that the hole is deep enough to allow 

the anchor to be flush with the finished deck surface.

6.

  Ground the anchor according to your local code requirements.  This may require additional drilling 

and/or other tools.

3

Summary of Contents for Power EZ 2

Page 1: ...lift with a dry pool Check entire box and all packing materials for parts Before beginning assembly read the instructions and identify parts using the gures and parts listed in this document It is cri...

Page 2: ...BLY SLING BAR 4 IN SLING HANDSET CONTROL BATTERY CHARGER QTY DESCRIPTION 1 24V LINAK CONTROL BOX 1 24V LINAK BATTERY CHARGER 1 LINAK HANDSET REMOTE 1 24V BATTERY 1 EZ SLING 1 EZ CHAIN SET 1 EZ HANGER...

Page 3: ...modate another person 2 Locate the concrete anchor socket Be careful to not lose the protective cap on the anchor as this will be used to keep dirt and debris out of the socket when the lift is not in...

Page 4: ...equivalent prior to inserting the anchor As you insert the anchor rotate it back and forth so that you can evenly distribute the cement or epoxy around the anchor 8 Once anchor is level and flush with...

Page 5: ...an accommodate another person 2 Locate the concrete anchor socket Be careful to not lose the protective cap on the anchor as this will be used to keep dirt and debris out of the socket when the lift i...

Page 6: ...es connect the lower end of the linear actuator to the mast vertical post with one 1 3 8 x 1 3 4 hex bolt two 2 3 8 flat washers and one 1 3 8 nylock nut STEP 3 Connect the upper end of the actuator t...

Page 7: ...the 1 4 button head lock and flat washer Mount the FULLY CHARGED 24V battery on top of the control box When properly mounted the battery will lock in place causing a click sound and will sit flush and...

Page 8: ...engage the brakes on the wheelchair 2 With the user facing the assistant gently slide the mesh seat sling under the seated user while still in the wheelchair 3 Attach the chain to the mesh sling and...

Page 9: ...The cord plug is ush with or sticking out of the outlet Properly Inserted The cord plug is recessed into the outlet POP The Charger is ON when the green light is glowing The Battery is CHARGING when...

Page 10: ...eded ProperCareofPool SpaLifts PROPER CARE NOTES Use only fresh water to wash your lift Do not wash with pool water Use only clean soft non abrasive cloths on your lift Do not store lift in pump room...

Page 11: ...16 19 1 BRB SS 1216 4 BUSHING BRONZE SLEEVE 3 8 X 1 2 X 1 4 20 1 F UBC BATTERY COVER 21 2 SQR 2 10 14 2X2 SQUARE BLACK CAP 22 2 BSH 10 X 3 8 BOLT 316 SS 10 24 X 3 8 SHCS 23 1 WF 10 WASHER FLAT 10 SAE...

Page 12: ...iption of the product its serial number the dates of purchase and installation and the exact nature of the defect Within thirty 30 days after receipt of a written warranty claim by Aqua Creek and barr...

Page 13: ...rating a p hooting and C002 and an component ce immediat dden inconsi ce any lift th s have been reek Pro For Tol Int ps aquacre lead to actu e product op oad before e aracteristics used For exa r or...

Page 14: ...for any da to ensure pr at belts and e fatigue an NS Aqua Cr swimming p most instanc ning of the b a thorough c ents and or nchors etc d anchors are rectly and is clean corro missing pow sh cracks or...

Page 15: ...con the lift is no attery on th battery cha is helpful A ake commen of damage an prevent corr OT IN USE ed on contr he voltage o Note Vito b tinuity throu e of the actu self if applic known good d up...

Page 16: ...thou ht to test th on connected e lift is funct on stalled corre anything lik 0 degrees ov NS Aqua Cr uired when d ut a load prio e lifts functi operate the tioning corre ectly is the li e a wall rail...

Reviews: