![APT VEYRON IV 3.2KW User Manual Download Page 56](http://html1.mh-extra.com/html/apt/veyron-iv-3-2kw/veyron-iv-3-2kw_user-manual_2957020056.webp)
54
If communication between the inverter and battery is successful, the battery icon
on LCD display will
flash. Generally speaking, it will take longer than 1 minute to establish communication.
WECO
Step 1. Use a custom-made RJ45 cable to connect inverter and Lithium battery.
Please take notice for parallel system:
1.
Only support common battery installation.
2.
Use one custom-made RJ45 cable to connect any inverter (no need to connect to a specific inverter) and
Lithium battery.
Simply set battery type of this inverter to “WEC” in LCD program 5. The remaining
inverters are set as “USE”.
Step 2. Switch on Lithium battery.
Step 3. Turn on the inverter.
Step 4. Be sure to select battery type as “WEC” in LCD program 5.
If communication between the inverter and battery is successful, the battery icon
on LCD display will
“flash”. Generally speaking, it will take longer than 1 minute to establish communication.