FIXTURE TO THE PILLAR
Using a spirit level, fix the
fixing base
in position with suitable fixing
plugs depending on the type of pillar (Pic. 7) (not provided). When
deciding the height at which to fix it to the pillar, consider at what
point the
articulated arm
will be connected to the gate leaf: preferably
on a strong upright. The
fixing shoe
(Pic. 6) must be bolted or welded
into position at a distance established after the initial manual leaf
opening and closing tests, following the indicated installation heights
(Pic. 8).
Once the fixing base has been installed, insert and fix the electric
motor/hydraulic jack assembly into position using the
4 fixing screws
– B
(Pic. 5).
The following table indicates some installation distances. These are
not obligatory and are for reference purposes only (Pic. 8).
The distances indicated must be used to obtain an automation that
is able to close the leaf decisively.
PIC. 7
Pillar dimensions
A (mm)
B (mm)
C (mm)
D (mm)
G
°
Gate leaf
400 x 400 (mm)
510
200
460
50
100
°
2,0 m
500 x 500 (mm)
560
250
460
60
100
°
3,0 m
600 x 600 (mm)
560
300
460
/
95
°
1,80 m
700 x 700 (mm)
580
350
580
140
95
°
3,0 m
800 x 800 (mm)
620
400
580
135
90
°
4,0 m
900 x 900 (mm)
650
450
580
50
90
°
5,0 m
POWER CABLE ALREADY
INSERTED INSIDE A TUBE
PREPARED BEFORE
INSTALLATION INSIDE THE
PILLAR
FIXING BASE
AND BRACKET
FIXING PLUGS
LEVEL
PILLAR
D
40
G
°
A
B
C
20 mm from the pillar edge
GATE STOP IN
CLOSED GATE
POSITION
110
PILLAR
CLOSED LEAF
OPEN LEAF
GATE STOP IN
OPEN GATE
POSITION