-
18
-
English
External dimensions / Preliminary operations
4.4
BARRIER BODY EXTERNAL DIMENSIONS
90
∅
80
25
200
230
410 (E series)
355 (X series)
969
893
375
(E series)
380
(X series)
65
25
∅
80
∅
80
310 (E series)
315 (X series)
310
(E series)
315
(X series)
fig.2
fig.3
5. INSTALLATION
5.1
PRELIMINARY CONTROLS AND PRECAUTIONS
Before proceeding with the installation please check the following:
- The installation area must be large enough to fully accommodate the barrier in the open and closed positions (see
Fig. 2
).
- The installation area must be solid and fl at, particularly in the areas where the components are mounted on the
ground.
- Evaluate whether it is necessary to install an end support fork (optional) -
advisable in the case of very long barriers
.
WARNING:
The barrier is supplied in
the right hand confi guration, i.e. when it
is viewed from the barrier side, it opens
clockwise (see
fi g .3
).
To change it to the left hand confi guration,
refer to para. “Changing the barrier
confi guration”.