COMMISSIONING
The steps that must be done to commission the product are closely tied to installation and the required
checks to identify any non-conformities that could compromise proper machine operation.
CHECK
When the machine is installed and all the connections have been made, a general check must be done
before starting up the machine using the specific control.
It is a good idea to carefully follow what is described in the manual in order to run a check with efficient
results.
The check involves the following positions:
-
proper positioning of all the connectors and power supply plugs;
-
proper positioning of the protective guards on the machine;
-
making sure the panels to access the internal parts of the machine are closed properly;
-
making sure the indicated pictograms and warning plates are present and positioned properly in
the locations described in this manual.
FIRST START-UP
WARNING! After having positioned the machine, wait about 2 hours before powering it to
allow the coolant to stabilise.
After having run the checks described in the previous paragraph and having corrected any non-
conformities, the machine can be started.
Start the machine, making sure there are no unusual mechanical noises that could be a sign of the
machine’s mechanical parts functioning poorly; if there are any doubts, stop the machine and
communicate the problem to the manufacturer’s or retailer’s Technical Assistance Centre.