AST, AST-L, and AST-PLUS Models
19
Anthony Lifgtates, Inc.
800-482-0003
www.anthonyliftgates.com
20. Remove the installation brackets from the floor
extension.
ALI-00378
4.4.5 Installing Optional DOT Tubular Bumper
1. If desired, install the optional tubular bumper using
the supplied hardware. Make sure the installation is in
compliance with all State and Federal regulations.
ALI-00411
2.
With the liftgate in the stored position, attach the
red and white reflective tape.
4.4.6 Mounting Control Switch and Routing the
Power Cable
1. Remove the slave battery’s jumper cables and
disconnect the wires of the control switch from the
power unit.
2. Mount the control switch to the truck’s rear curbside
post, so it can be reached while standing at the
curbside of the truck, away from the liftgate platform.
3. Disconnect the wires of the control switch from the
power unit.
4. Install the protective rubber grommet in the dock
bumper and route the wire through the dock bumper.
5. Reattach the control unit wires to the appropriate
terminals, as shown.