02/08/2016
SDR-ASR11-052
TI 6310.59
74a
Replacing the Polarization and Beamswitch Control Box
WARNING
220 Volts AC is present at the Weather Beam Switch Box
a.
Inside the pedestal room set the
Emergency Safety Switch
to the
‘Off’
position. Attach a Lockout/
Tagout device to Emergency Safety Switch. Set the
polarizer switch
of the PLCP (Pedestal Local Control
Panel) to the
0 or off position
. This will remove 220 Volts AC going to the Polarization and Beamswitch
Control Box.
b.
Attach a Lockout device to Emergency Safety Switch and then tag-out both switches..
c.
On the Antenna Platform, locate the Antenna Stow Pin and lock the antenna in the stowed position.
d.
Locate the existing Polarization and Beamswitch Control Box. Remove existing Weather Proofing
completely from the connectors.
e.
Disconnect all cables including the ground cables from the old Control Box. Cable locations are marked
on the Control Box as well on the cables themselves.
Figure 4a. Polarization and Beamswitch Control Box Location on Antenna
*
*
Summary of Contents for 174100
Page 17: ...17 Figure 1 1 Typical Pattern Azimuth...
Page 18: ...18 Figure 1 2 Typical Pattern Elevation...
Page 19: ...19 Figure 1 3 Polarizer Schematic...
Page 20: ...02 08 2016 SDR ASR11 052 TI 6310 59 20...
Page 22: ...22 Figure 3 1 Complete Antenna Installation...
Page 23: ...23 Figure 3 2 Shipping and Support Stand...
Page 33: ...33 Figure 3 3 Base Interface Kit PSR Base Assembly...
Page 35: ...35 Figure 3 4 Fixed Feeds Unit Installation...
Page 42: ...42 Figure 3 5 Ladder Kit Installation...
Page 45: ...45 Figure 3 6 PSR SSR Interface Mount Installation...
Page 49: ...49 Figure 3 7 Antenna Lift Kit Installation...
Page 54: ...54 Figure 3 8 Waveguide Installation...
Page 55: ...55 Figure 3 9 Waveguide Hanger Installation...
Page 61: ...61 Figure 3 11 SSR Coaxial Cable Installation and Tilt Scale Bracket Installation...
Page 65: ...65 Figure 3 12 Antenna Feedhorn and Tilt Alignment Contour Cheek...
Page 66: ...66 Figure 3 13 Antenna Azimuth Alignment...
Page 67: ...67 Figure 3 14 Counterweight Installation...
Page 81: ...02 08 2016 SDR ASR11 052 TI 6310 59 75 This Page Intentionally Left Blank...
Page 82: ...76 Figure 4 1 Polarizer...
Page 83: ...77 Figure 4 2 Polarizer Motor Replacement...
Page 87: ...81 Figure 5 1 Test Antenna Kit...