7.4
Start the engine
7.4.1
Ignition switch
7.4.2
Start the engine
1
Fold the vandalism protection cover all the way back.
2
Move the operating lever into the neutral position until it locks in.
3
Put the speed adjusting lever into the idle position.
4
Turn the ignition key clockwise to position III.
5*
Release the ignition key as soon as the engine starts.
Fig. 7-5 Starting motor / position of operating lever and speed adjusting lever
NOTE
The control lamps for engine oil pressure, charging, hydraulic brake
release/supply pressure light up when the ignition is switched on. They
extinguish once the engine is running.
Pre-heating
If the outside temperature is below 0°C:
1
Turn the ignition key to position II
1.1
hold it in this position for 15sec.
2
Turn the ignition key further to position III.
NOTE
When starting and driving the roller from cold, with cold hydraulic oil, braking
distances are longer than when the oil has reached normal working
temperature.
P
PARK
In this position you can switch on the parking light. The remaining electrical
loads are off.
0
Off
All electrical loads are off.
I
Ignition on
All electrical consumers can be switched on.
II
Pre-heating
III
Start
Summary of Contents for 6120529
Page 2: ......
Page 4: ......
Page 6: ...6 ARX 1 1201281 A 24 07 2013 ...
Page 12: ...12 ARX 1 1201281 A 24 07 2013 ...
Page 13: ...13 1201281 A 24 07 2013 1General ...
Page 18: ...18 ARX 1 1201281 A 24 07 2013 ...
Page 19: ...19 1201281 A 24 07 2013 2Product description ...
Page 26: ...26 ARX 1 1201281 A 24 07 2013 ...
Page 27: ...27 1201281 A 24 07 2013 3Safety information ...
Page 38: ...38 ARX 1 1201281 A 24 07 2013 ...
Page 39: ...39 1201281 A 24 07 2013 4Structure and function ...
Page 43: ...43 1201281 A 24 07 2013 5Operating and display elements ...
Page 52: ...52 ARX 1 1201281 A 24 07 2013 ...
Page 53: ...53 1201281 A 24 07 2013 6Commissioning ...
Page 55: ...55 1201281 A 24 07 2013 7Operation ...
Page 69: ...69 1201281 A 24 07 2013 8Options ...
Page 85: ...85 1201281 A 24 07 2013 9Maintenance ...
Page 124: ...122 ARX 1 1201281 A 24 07 2013 ...
Page 125: ...123 1201281 A 24 07 2013 10Repair ...
Page 134: ...132 ARX 1 1201281 A 24 07 2013 ...
Page 135: ...133 1201281 A 24 07 2013 11Storage ...
Page 138: ...136 ARX 1 1201281 A 24 07 2013 ...
Page 139: ...137 1201281 A 24 07 2013 12Transport ...
Page 144: ...142 ARX 1 1201281 A 24 07 2013 Fig 12 6 Roller s center of gravity ...
Page 145: ...143 1201281 A 24 07 2013 13Disposal ...
Page 148: ...146 ARX 1 1201281 A 24 07 2013 ...
Page 149: ...147 1201281 A 24 07 2013 14Appendix ...
Page 162: ...160 ARX 1 1201281 A 24 07 2013 ...
Page 165: ......