6. Open the carton of parts and check the parts according to the parts box list
(See Fig. 8)
.
7. Check the parts of the parts bag according to the parts bag list
(See Fig. 9)
.
B. Use a carpenter’s chalk line to establish installation layout as per Table 1
Make sure the size is right and base is flat
(see Fig. 10).
Note: Reserve space front and behind the installation site.
B
A
C
1
Fig. 8
Fig. 9
Fig. 10
Use a carpenter’s chalk line to establish
installation layout
2