6
B. SPECIFICATIONS OF CONCRETE
(See Fig. 6)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 6” minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
minimum.
3. Floors must be level without cracks.
C. POWER SUPPLY
The electrical source must be 2.0HP minimum. The source cable size must be 2.5mm²
and in good condition of contacting with floor.
III
.
STEPS OF INSTALLATION
A. Location of Installation
Check and insure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B.
Use a carpenter’s chalk line to establish installation layout of base-plate
(See Fig.7)
.
Fig. 7
Fig. 6
Click a line
59
6
”
Concrete must be 3,000psi
minimum
Summary of Contents for OHX-10
Page 1: ...TWO POST LIFT Model OHX 10 OHX 10H Original...
Page 5: ...3 Arm Swings View Car in Fig 3...
Page 6: ...4 Swing and extending the arms to the lifting point of vehicle Fig 4...
Page 19: ...17 I Lift the carriages up and make them be locked at the same level See Fig 26 Fig 26...
Page 25: ...23 M Install safety cable See Fig 32 Fig 32 Wearing wire cable A side B side 25 25 86 7...
Page 34: ...32 IV EXPLODED VIEW OHX 10 Fig 46...
Page 35: ...33 OHX 10H Fig 47...
Page 41: ...39 5 Power unit 071101 explosive view single phase 220V 60HZ Fig 52...