Place the two columns in parallel on the ground of the installation position, and
determine the installation position of the power-side column according to the
condition of the installation site. Under normal circumstances, the power-side
column is installed on the right side of the entering direction; when installing
the outer column, it should be installed according to the height of the workshop.
When the height is not more than 168", the mounting column is selected to
install the lower position; when the height is more than 168", the mounting
column can be installed with the high position. (See Fig.21)
Fig.21
Mounting column low
setting
Mounting column high setting
28
2
3
1
18
Summary of Contents for OHX-10
Page 1: ...TWO POST LIFT Model OHX 10 OHX 10H Original...
Page 5: ...3 Arm Swings View Car in Fig 3...
Page 6: ...4 Swing and extending the arms to the lifting point of vehicle Fig 4...
Page 19: ...17 I Lift the carriages up and make them be locked at the same level See Fig 26 Fig 26...
Page 25: ...23 M Install safety cable See Fig 32 Fig 32 Wearing wire cable A side B side 25 25 86 7...
Page 34: ...32 IV EXPLODED VIEW OHX 10 Fig 46...
Page 35: ...33 OHX 10H Fig 47...
Page 41: ...39 5 Power unit 071101 explosive view single phase 220V 60HZ Fig 52...