SECTION 2
INSTALLATION
2.1
Introduction
This section provides recommendations and procedures for inspecting, testing, and installing
the DLM–E Series power supply.
1. Read and follow safety recommendations (Section 2.2)
2. Perform an initial physical inspection of the supply (Section 2.3)
3. Become familiar with Controls, Indicators and Rear Panel layout (Section 2.4)
4. Install the supply, ensuring adequate ventilation (Section 2.5)
5. Connect the AC input power (Section 2.6)
6. Perform initial function tests for voltage mode operation, current mode operation, and
front panel controls (Section 2.7)
7. Connect the load (Section 2.8)
Instructions for Local Programming Mode operation (Constant Voltage and Constant Current)
are given in Section 3 Basic Operation. Remote Programming operation, monitoring, and
programmable functions are described in Section 4 Advanced Operation
.
2.2
Safety
Please review the following points for both personal and equipment safety while using the
DLM–E Series power supplies.
2.2.1
High Energy/High Voltage Warning
Exercise caution when using and servicing power supplies. High energy levels can be stored at
the output voltage terminals on all power supplies in normal operation. In addition, potentially
lethal voltages exist in the power circuit and the output connector of power supplies that are
M362000-01 Rev E
2-1
Summary of Contents for Sorensen DLM-E
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...viii M362000 01 Rev E This page intentionally left blank...
Page 8: ...x M362000 01 Rev E This page intentionally left blank...
Page 10: ...xii M362000 01 Rev E This page intentionally left blank...
Page 12: ...xiv M362000 01 Rev E This page intentionally left blank...
Page 18: ......