Installation & Start-Up | 3-9
6. Working with one dryer at a time to minimize the time that the de-
vice is exposed to room air, remove the first dryer from its packaging.
Loosen the 1/8 inch VCR fittings.
7. Using two of the dryer mounting screws, attach the dryer in the top or
sample system position (Figure 3-4b).
8. Working quickly, install a new 1/8” VCR gasket in both of the fittings,
and tighten the two VCR nuts over the fittings until they are finger
tight.
9. Tighten the nut an additional 1/8 turn.
10. Repeat steps 6 through 9 for the second dryer, which you will mount
in the bottom or zero dryer position (Figure 3-4b).
11. Replace the dryer compartment cover.
12. The production codes for the dryers supplied with the analyzers have
been entered at the factory, so there is no need to enter them during
an initial startup of the analyzer. For all subsequent replacement/in-
stallations of replacement dryers, you will need to enter a production
code for the reference dryer (see details in Chapter 4).
Figure 3-4b.
Inside dryer compartment.
Sample System
Dryer
Zero Dryer
Dryer Mounting Screws
Summary of Contents for 3050-AMS
Page 12: ...xii 3050 AMS Moisture Analyzer This page intentionally left blank...
Page 22: ...2 4 3050 AMS Moisture Analyzer This page intentionally left blank...
Page 25: ...Installation Start Up 3 3 Figures 3 1c Model 3050 AMS dimensions top and sides...
Page 42: ...3 20 3050 AMS Moisture Analyzer This page intentionally left blank...
Page 64: ...5 10 3050 AMS Moisture Analyzer This page intentionally left blank...
Page 66: ...6 2 3050 AMS Moisture Analyzer This page intentionally left blank...
Page 84: ...7 18 3050 AMS Moisture Analyzer This page intentionally left blank...
Page 96: ......