![AmeriGlide STRATOS VPL Installation & Service Manual Download Page 27](http://html.mh-extra.com/html/ameriglide/stratos-vpl/stratos-vpl_installation-and-service-manual_2930295027.webp)
STRATOS WITH ENCLOSURE:
Install Manual
25MAR2022 | 630-00147 C
27
INSTALLATION QUICK START
STRATOS WITH ENCLOSURE: SECTION 5
SECTION 5
INSTALLATION QUICK START
SITE PREP
Code Compliance
Upper Landing
Foundation Level
Hoistway Square
Electrical
Code: ASME 18.1 relative to residential or commercial,
NAEC and Local Building; NFPA 70 (electrical code).
POSITION LIFT BENEATH LANDING
Remove Top Cap
Remove Front Panel
Verify Overhead Clearance at 79
"
min
TIP: Use material handling equipment with lifting straps
to avoid injury/damage.
ASSEMBLE PLATFORM
Attach Platform to Carriage
Bolt on Side Walls
Attach and Wire Control Panel
Tip: Use 2'x4' beneath platform base when connecting to
carriage.
FINAL POSITIONING & ANCHORING
Level and Perpendicular
Anchor Tower Legs
Anchor Tower to Structure
Fixed Ramp Securement*
VERIFY CLEARANCES:
Platform opening to landing: 3/8
"
- 3/4
"
Guard panel to hoistway wall: 2
"
- 3
"
WIRING & ELECTRICAL
Gates*/Doors/Interlocks/Openers
Call/Sends*
Install and Connect Battery Backup*
Dedicated Line to Primary Power Source
TIP: Use knockouts provided along tower to minimize wire
distance.
FINAL
Perform Final Function Tests
Insert permanent power installation
Reattach Top Cap Panel and Front Cover
Operator Familiarization
Complete Warranty Form
Write Date/Info on Lift
* If required/included
Summary of Contents for STRATOS VPL
Page 2: ......
Page 44: ...866 378 6648 ameriglide com ...