Use of the implement
Centaya Super BAH0092-6 10.20
185
3.3 Remove the metering roller.
Fig. 236
4. Hopper emptying
4.1 Close the housing cover and secure
with 2 bolts (Fig. 237/1).
Do not insert the metering roller into
the metering unit.
4.2 Pull the shutter (Fig. 237/2) slowly out
of the metering unit.
The contents of the hopper drop into
the carriages.
4.3 Thoroughly clean the hopper, metering
unit and the metering roller.
Fig. 237
5. Reassembly
5.1 Reassembly takes place in the reverse
sequence.
Fig. 238
Attach the shutter onto the metering
unit with 2 nuts (Fig. 238/1).
Summary of Contents for Amazone Centaya 3000 Super 1600
Page 2: ......
Page 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Page 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Page 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Page 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Page 220: ......
Page 221: ......