Cleaning, maintenance and repairs
ZG-TS BAG0203.2 06.19
81
10.3
Maintenance schedule – overview
•
Carry out maintenance work when the first interval is
reached.
•
The times, continuous services or maintenance intervals of
any third party documentation shall have priority.
Before each start-up
1. Check hoses/tubes and connection pieces for any visually obvi-
ous defects/leaking connections.
2. Repair any areas of chafing on pipes and hoses.
3. Immediately replace worn or damaged hoses and pipes.
4. Immediately repair leaking connections.
Once after 50 operating hours
Component
Maintenance work
see
page
Workshop work
Angular gearbox
•
Oil change
90
After the first working run
Component
Maintenance work
see
page
Workshop work
Hydraulic system
•
Check for leak tightness
•
Check for defective hose lines
85
X
Daily
Component
Maintenance work
see
page
Workshop work
Whole implement
•
Check for visible defects
Control butterfly valve
•
Check for ease of movement and
adjust if necessary
84
Outlet openings
•
Clean
Agitator
•
Check for damage
Spreading vanes
•
Condition check, replace if nec-
essary
82
Hydraulic fluid filter
•
Check clogging indicator, clean
or replace if necessary
89
X
Monthly / every 50 operating hours
Component
Maintenance work
see page
Workshop work
Hydraulic system
•
Check for leak tightness
•
Check for defective hose lines
85
X