Cleaning, maintenance and repairs
232
UX01 Super CP Plus BAG0229.2 11.21
Pressure gauge test
and boom part width section chest
1. Remove one spray line from a part-width
section valve and seal it with the blind hose
(order no. 1166060).
2. Connect the pressure gauge connection to
a part width section valve with the help of
the turned socket.
3. Screw the check gauge 1/4 of an inch into
the inside thread.
4. Switch on spraying
DUS pro single nozzle control
1. Disconnect the return line (1) beside the
pressure sensor and seal it with the blind
hose (order no. 1166060).
2. Connect the pressure gauge connection
(order no. 7107000) to the spray line (2).
3. Screw the check gauge 1/4 of an inch into
the inside thread.
4. Switch on spraying.