![Amazone TSE 3000 Operating Manual Download Page 93](http://html1.mh-extra.com/html/amazone/tse-3000/tse-3000_operating-manual_2919778093.webp)
12.2
Index
A
Address
Technical editing
Adjusting the row spacing
Adjusting the tramline marker
Adjusting the track disc pitch
Adjusting the track width
Adjusting the tramline wheelmark width
Connecting the tramline segments
Disconnecting tramline segments
Unfolding the tramline marker
Adjusting the TwinTeC seeding coulter
Adjusting the additional coulter pressure
Adjusting the coulter pressure
Adjusting the placement depth
Checking the placement depth
Deactivating the harrow tines
Lifting the coulters
Adjusting the working position sensor
Aids
B
Bolt tightening torques
C
Calculating the tractor characteristics
Checking the lower link pin
Checking the seed placement depth
Checking the top link pin
Cleaning
Cleaning the segment distributor head
Contact data
Technical editing
Coulter pressure
additional adjustment
adjustment
Coupling the implement
Coupling the ISOBUS supply
Coupling the seeding rail
Coupling the supply lines to the hose package 42
Coupling the ISOBUS supply
Coupling the seeding rail
Coupling the supply lines to the hose package
D
Dimensions
Disconnecting the supply lines from the hose
package
Documents
Drivable slope inclination
F
Folding the tramline marker
Function of the implement
H
Harrow tines
adjustment
disabling
Hydraulic connection
Functions
Hydraulic hoses
checking
coupling
uncoupling
Hydraulic system
coupling
uncoupling
I
Implement lowering
Implement overview
Implement
preparing
preparing for operation
Intended use
12 | Indexes
Index
MG6860-EN-II | A.1 | 20.07.2020
89
Summary of Contents for TSE 3000
Page 1: ...Operating manual MG6860 EN II A 1 20 07 2020 seeding rail TSE 3000 Original operating manual...
Page 96: ......
Page 97: ......