![Amazone TSE 3000 Operating Manual Download Page 46](http://html1.mh-extra.com/html/amazone/tse-3000/tse-3000_operating-manual_2919778046.webp)
6.2
Coupling the implement
6.2.1 Coupling the supply lines to the hose package
1.
To connect the conveyor hose
5
to the hose
package
1
,
couple the connecting piece with the bracket
2
.
2. Depending on the implement equipment, connect
the second conveyor hose to the hose package.
Pay attention to the markings on the conveyor
hoses.
3. Depending on the implement equipment, connect
the front hopper supply
3
to the hose package.
4. Depending on the implement equipment, connect
the metering unit shutoff
4
to the hose package.
4
ME1212
A
5
1
2
3
CMS-I-00003124
6.2.2 Coupling the hydraulic hoses
WARNING
Risk of injury or even death
If the hydraulic lines are incorrectly
connected, the hydraulic functions can be
faulty.
When coupling the hydraulic hoses,
observe the colour markings on the
hydraulic plugs.
NOTICE
Implement damage due to insufficient oil
return flow
Only use DN16 lines for the oil return.
Select short return paths.
Couple the free return flow correctly.
Install the supplied coupling sleeve on the
pressure-free oil return.
CMS-T-00004890-A.1
CMS-T-00004439-A.1
CMS-T-00000276-D.1
6 | Preparing the machine
Coupling the implement
MG6860-EN-II | A.1 | 20.07.2020
42
Summary of Contents for TSE 3000
Page 1: ...Operating manual MG6860 EN II A 1 20 07 2020 seeding rail TSE 3000 Original operating manual...
Page 96: ......
Page 97: ......