6.3.2.6 Adjusting the additional coulter pressure
1. Remove the linch pin
1
.
2. Remove the washer
2
.
3. Move the spring holder
3
to the desired
position.
4. Install the washer.
5. Install the linch pin.
1
2
3
+
-
CMS-I-00003181
6.3.2.7 Lifting the coulters
1.
To lift the coulters, set the coulter pressure to
the value 0,
See ISOBUS software operating manual
"Pre-
selection for hydraulic functions"
.
2. Actuate the
"green 2"
tractor control unit.
6.3.3 Adjusting the tramline marker
6.3.3.1 Unfolding the tramline marker
1. Remove the pin
1
from the pegging hole
3
.
2. Move the swivel arm
2
into working position.
3. Secure the swivel arm
3
in the middle hole.
4.
To secure the pin in the adjuster segment,
turn the pin down.
CMS-I-00003168
CMS-T-00004371-A.1
CMS-T-00004416-A.1
CMS-T-00004373-A.1
CMS-T-00004374-A.1
6 | Preparing the machine
Preparing the implement for operation
MG6860-EN-II | A.1 | 20.07.2020
51
Summary of Contents for TSE 3000
Page 1: ...Operating manual MG6860 EN II A 1 20 07 2020 seeding rail TSE 3000 Original operating manual...
Page 96: ......
Page 97: ......