![Amazone TSE 3000 Operating Manual Download Page 88](http://html1.mh-extra.com/html/amazone/tse-3000/tse-3000_operating-manual_2919778088.webp)
REQUIREMENTS
The seeding combination is unfolded
1. Only attach the lifting gear at the marked
positions.
2. Hang the slings on the crane with a crossbeam.
3. Load the machine with a crane.
4. Slowly lift the machine.
5. Place the implement on the transport vehicle and
lash it down as prescribed.
CMS-I-000089
10.2
Loading the seeding rail with a crane
The seeding rail has 4 lashing points for slings.
NOTE
The lashing points must only be used to load the
individual seeding rail sections without the soil
tillage implement.
CMS-I-00003673
2 lashing points on the coupling plates
1
.
1
CMS-I-00003253
CMS-T-00005121-A.1
10 | Transporting the machine
Loading the seeding rail with a crane
MG6860-EN-II | A.1 | 20.07.2020
84
Summary of Contents for TSE 3000
Page 1: ...Operating manual MG6860 EN II A 1 20 07 2020 seeding rail TSE 3000 Original operating manual...
Page 96: ......
Page 97: ......