Use of the machine
10.1
Working position and operating position of the implement
10.1.1
Converting from working to transport position
1. Actuate the
yellow
tractor control unit.
→
Lift the implement via running gear and drawbar.
2. Move the drawbar cylinder into transport position.
3. Ceus 7000-2TX - disc array: Move both side discs into transport
position.
4. Ceus 7000-2TX - levelling unit: Move both side elements into
transport position.
5. Cover the rear harrow with the transport safety bar.
6. Move the rear harrow into transport position.
Implements with tandem roller: Set the maximum working depth.
→
This ensures that the transport width of 3 m is not exceeded.
7. Actuate
blue
tractor control unit.
→
Fold in the implement.
8. Ceus 7000-2TX: Actuate the
yellow
tractor control unit.
→
Lower the implement height to less than 4 m. In doing so, main-
tain a ground clearance of 20 cm, align the implement horizon-
tally.
9. Cover the 3 lower tines (left and right) with the protective tarpau-
lin.
96
Ceus-2TX BAG0183.2 01.19