7
IV
IV
IV
IV
IV. LOC
. LOC
. LOC
. LOC
. LOCA
A
A
A
ATI
TI
TI
TI
TIO
O
O
O
ON REQUIREMENTS & CO
N REQUIREMENTS & CO
N REQUIREMENTS & CO
N REQUIREMENTS & CO
N REQUIREMENTS & CONSID
NSID
NSID
NSID
NSIDERA
ERA
ERA
ERA
ERATI
TI
TI
TI
TIO
O
O
O
ONS
NS
NS
NS
NS
G
ENERAL
WARNING
T
O PREVENT POSSIBLE EQUIPMENT DAMAGE, PROPERTY DAMAGE, PERSONAL
INJURY OR DEATH, THE FOLLOWING BULLET POINTS MUST BE OBSERVED
WHEN INSTALLING THE UNIT.
Follow the instructions listed below when selecting a furnace loca-
tion. Refer also to the guidelines provided in
Section V, Combus-
tion and Ventilation Air Requirements.
•
Centrally locate the furnace with respect to the proposed
or existing air distribution system.
•
Ensure the temperature of the return air entering the
furnace is between 55°F and 100°F when the furnace is
heating.
•
Provide provisions for venting combustion products
outdoors through a proper venting system. Special
consideration should be given to vent/flue pipe routing and
combustion air intake pipe when applicable. Refer to
Section IX, Vent/Flue Pipe and Combustion Air Pipe -
Termination Locations
for appropriate termination locations
and to determine if the piping system from furnace to
termination can be accomplished within the guidelines
given.
NOTE:
The length of flue and/or combustion air
piping can be a limiting factor in the location of the furnace.
•
Locate the furnace so condensate flows downwards to the
drain. Do not locate the furnace or its condensate drainage
system in any area subject to below freezing temperatures
without proper freeze protection. Refer to
Section X,
Condensate Drain Lines and Trap
for further details.
•
Ensure adequate combustion air is available for the
furnace. Improper or insufficient combustion air can expose
building occupants to gas combustion products that could
include carbon monoxide. Refer to
Section V, Combustion
and Ventilation Air Requirements.
•
Set the furnace on a level floor to enable proper condensate
drainage. If the floor becomes wet or damp at times, place
the furnace above the floor on a concrete base sized
approximately 1-1/2" larger than the base of the furnace.
Refer to the
Section VII, Horizontal Applications and
Considerations
for leveling of horizontal furnaces.
•
Ensure upflow or horizontal furnaces are not installed
directly on carpeting, or any other combustible material.
The only combustible material allowed is wood.
•
A special accessory subbase must be used for upright
counterflow unit installations over any combustible material
(including wood). Refer to subbase instructions for
installation details. (NOTE: A subbase will not be required
if an air conditioning coil is located beneath the furnace
between the supply air opening and the combustible floor.
•
Exposure to contaminated combustion air will result in
safety and performance-related problems. Do not install
the furnace where the combustion air is exposed to the
following substances:
chlorinated waxes or cleaners
chlorine-based swimming pool chemicals
water softening chemicals
deicing salts or chemicals
carbon tetrachloride
halogen type refrigerants
cleaning solutions (such as perchloroethylene)
printing inks
Air Requirements, Section 5.3.3.
•
The furnace heat exchanger, components, duct system,
air filters and evaporator coils are thoroughly cleaned
following final construction clean up.
•
All furnace operating conditions (including ignition, input
rate, temperature rise and venting) are verified according
to these installation instructions.
NOTE:
The Commonwealth of Massachusetts requires that the
following additional requirements must also be met:
•
Gas furnaces must be installed by a licensed plumber or
gas fitter.
•
A T-handle gas cock must be used.
•
If the unit is to be installed in an attic, the passageway to
and the service area around the unit must have flooring.
To ensure proper installation and operation, thoroughly read this
manual for specifics pertaining to the installation and application of
this product.
WARNING
P
OSSIBLE PROPERTY DAMAGE, PERSONAL INJURY OR DEATH DUE TO FIRE,
EXPLOSION, SMOKE, SOOT, CONDENSTAION, ELECTRICAL SHOCK OR CARBON
MONOXIDE MAY RESULT FROM IMPROPER INSTALLATION, REPAIR, OPERATION,
OR MAINTENANCE OF THIS PRODUCT.
WARNING
T
O PREVENT PROPERTY DAMAGE, PERSONAL INJURY OR DEATH DUE TO FIRE,
DO NOT INSTALL THIS FURNACE IN A MOBILE HOME, TRAILER, OR RECREATIONAL
VEHICLE.
To ensure proper furnace operation, install, operate and maintain
the furnace in accordance with these installation and operation in-
structions, all local building codes and ordinances. In their absence,
follow the latest edition of the National Fuel Gas Code
(NFPA 54/ANSI Z223.1), and/or CAN/CSA B149 Installation Codes,
local plumbing or waste water codes, and other applicable codes.
A copy of the National Fuel Gas Code (NFPA 54/ANSI Z223.1) can
be obtained from any of the following:
American National Standards Institute
1430 Broadway
New York, NY 10018
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02269
CSA International
8501 East Pleasant Valley
Cleveland, OH 44131
A copy of the CAN/CSA B149 Installation Codes can also be ob-
tained from:
CSA International
178 Rexdale Boulevard
Etobicoke, Ontario, Canada M9W 1R3
The rated heating capacity of the furnace should be greater than or
equal to the total heat loss of the area to be heated. The total heat
loss should be calculated by an approved method or in accordance
with “ASHRAE Guide” or “Manual J-Load Calculations” published
by the Air Conditioning Contractors of America.