
2110A PT Peanut Combine
Operation
Hitching Combine to
Tractor
1. Set the tractor drawbar in the center fixed
position with the hitch point centered
behind the end of the PTO shaft.
20” for 1-3/8” 21 spline CV shafts
20” for 1-¾” 20 spline CV shafts
An optional drawbar extension (AMADAS
part #61359) will be necessary to reach
the proper hitch point dimension on most
tractors with 1-3/8” 21 spline PTO output
shafts.
2. Position the three-point hitch lower lift
links in the raised position.
3. Install a 2-5/16” hitch ball on the tractor
stationary drawbar. A 1-¼” hole size and
2-5/16” high strength hitch ball are
required. Tighten the nut securely.
A hitch ball for a 1-1/8” and 1-½” size
hole is also available as well as a number
of bushings to ensure proper fit.
4. Position tractor so the hitch ball will slip
into the tongue-mounted ball socket
when lowered. Lubricate the ball socket
with grease. If combine is equipped with
optional pin hitch, lower/raise jack until
the pin hitch will be between the draw bar
and the upper pin plate. Once in
position, install the pin and pin keeper.
An optional bushing is available to match
the pin diameter of various tractors.
5. Using the jack, slowly lower the tongue
until the ball release handle snaps into
place.
6. Remove the jack and place on holding
bracket.
7. Attach the hydraulic hoses from the
header lift cylinder to one of the tractor
remote hydraulic valves.
8. Attach the dump bin operating hydraulic
hoses to a second remote hydraulic
valve.
IMPORTANT!
If the tractor is equipped
with a lift locking feature to prevent it
from inadvertently lowering, engage the
lock. If the tractor is equipped with a
quick hitch, we highly recommend that
you remove it. Failure to do so can
cause damage to the PTO shaft and
driveline.
Stow jack here
Header lift cylinder
DANGER
ALWAYS use the safety chains when
towing the combine. If the combine
separates from the towing vehicle, death
or serious injury can result.
MAN143
12/18/15
27
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...