
2110A PT Peanut Combine
Preparation
Pre-Delivery Checks
13. Open cleaning fan adjustment to maximum.
Check to see that the damper door opening
on cleaning fan intake is at least 10-3/8”
inches.
14. Replace or close all shields.
15. Install the PTO driveline and grease. Be
sure to set the tractor hitch ball (or tractor
clevis pin if equipped with pin hitch) at the
specified length from the PTO output shaft
(sketch). The PTO driveline should never
bottom out or overextend while turning.
16. Start the tractor, then engage the PTO and
increase slowly to operating speed (100%
or 790 PTO RPM). Operate for twenty
minutes prior to your first field operation.
17. Stop the combine and check for loose
bolts, nuts, chains, belts, sprockets, etc.
Check for heat in pulleys and belts,
indicating looseness. Also check for
overheated gearbox and hot bearings.
18. Check machine to ensure that all safety
decals are in place.
19. Check tire pressure and inflate tires to
recommended pressure:
Cold inflation pressure:
24 PSI – 24.5 x 32 12 ply (6 row)
[Standard for 6-row dump basket
combine]
26 PSI – 30.5 x 32 12 ply (6 row)
[Standard for 6-row OCS combine;
Optional for 6-row dump basket
combine]
CAUTION
Replace all shields before starting
combine operation. Driveline shields
and guards must be in place anytime the
combine will be in operation.
If shields and guards are not in place,
death or serious injury may result from
entanglement.
10 3/8”
NOTE!
790 PTO RPM is standard for most
machines. Some combines are equipped
with optional drives that require different
input speeds. Refer to the PTO RPM on
your machine.
MAN143
2/29/16
21
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...