Yoke Installation
Fig. A3
Fig. A4
Fig. A5
3.
Use a pencil and trace the entire outline of the yoke
assembly (Figure A3).
4.
Locate the four (4) Yoke mounting channels. Position
the mounting channels within the traced outline, as
noted in Step 3. All mounting channels should be
placed 4" from each end of the two Yoke assemblies
(Figure A4).
NOTE
The ground side of each Yoke mounting channel should
be facing outward.
5.
Once the mounting channels are in place, mark each
location (Figure A5).
Mounting
Channel
Yoke
Outline
Mounting
Channels
Mounting Hole
Locations
Pencil
4.00"
8.00"
CPSTT Installation Instructions
Fig. A6
A6A
⅝” Concrete Drill Bit
⅜" Concrete
Anchor
6.
Using a ⅝" concrete drill bit, drill an anchor hole 3" in
depth (Figure A6). Repeat this step for the remaining
mounting holes.
NOTES
The anchor hole(s) must be clean before installing the
anchor bolt(s). If the hole(s) are not clear of debris, the
anchor bolt(s) may not tighten correctly.
7.
Insert one anchor into the drilled hole (Figure A6A).
The threaded end of the anchor must be inserted into
the hole first. Use a hammer to tap the anchor into
place, if needed. Ensure that the anchor is flush with
the concrete floor.