background image

Full Height Tandem Installation Instructions

Page 16                [email protected]   +1(909) 591-8431   www.alvaradomfg.com  

Installation Instructions

 

Final Mechanical Installation Steps

Fig. 23

 

Drill

9/64" Drill Bit

#10 x ¾" Phillips  

pan head screw

Screwdriver

NOTE

 

Be sure that the turnstile is level  

 

 

 

before performing the following step(s). 

1. 

The anchor bolts (22 total) and the Top  

 

Channel mounting bolts should be tightened to  

 

40 ft-lbs using a torque wrench and appropriate  

 sockets. 
2. 

Using a drill and 9/64" drill bit, pre-drill six holes  

 

through the guard plate and into the Yoke (three  

 

along each side of the Yoke).

3. 

Insert and tighten six #10 x ¾" Phillips pan head  

 

screws (Figure 23).

 

4. 

Test the Roto for binding when it is functional. If  

 

there is  binding, loosen the mounting hardware and  

 

adjust as needed.

5. 

Test the Roto for binding. If no binding occurs,  

 

retighten all mounting hardware.

6. 

Repeat all previous steps for the second Guard  

 

Plate installation.

Key turned  

90°

Roto

Top 

Channel

Guard  

Plate

Fig. 24

NOTE

 

When shipped, the keys are attached to the chassis on the 

inside of the top channel.
The key override switch manually unlocks the turnstile in the 

desired direction. Key override switches are installed in the 

Top Channel, on either side of the Roto. 
To engage the key override, turn the key 90°.

NOTE

 

Remove keys when complete and store in a safe location. 

If the key override lock will not properly engage, please refer 

to the 'Troubleshooting' section.
This completes your installation 

of the MST. 
If the MST is electrically controlled,  

please proceed to the "Electrical  

Wiring Instructions" section.

Key

Key Override Operation

Non-Override

Override

NOTE

 

The key will always be parallel to the Top Channel in  

the override position. The key will always be  

perpendicular to the Top Channel in the non-override 

position.

Mounting Hole

Mounting Screw

 

Fig. 23A

23A Inset

Guard Plate Edge

¼-20 x 1" Screw

9/64" Drill Bit

CPST-T and CLST-T Installations

 

1. 

With the guard plate in place, use a pencil  

 

and mark each screw location. Each location  

 

should line up with the upper mounting  

 

channel mounting screw (Appendix A - A9),  

 

3/4" from the edge of the guard plate.

2. 

Using a drill and 9/64" drill bit, pre-drill four  

 

holes (two for each side of the Yoke).

3. 

Insert and tighten four #10 x ¾" Phillips pan  

 

head screws (Figure 23A inset).

Summary of Contents for CLSTT-3

Page 1: ...nstructions Alvarado Manufacturing Company Inc 12660 Colony Street Chino CA 91710 Toll Free 800 423 4143 Fax 909 628 1403 information alvaradomfg com www alvaradomfg com TANDEM FULL HEIGHT MAXIMUM SEC...

Page 2: ...op Bearing Cover Installation 15 Bottom Bearing Cover Installation 15 Final Mechanical Installation Steps 16 Key Override Operation 16 Conduit Instructions 17 Electrical Wiring Instructions 18 Turnsti...

Page 3: ...le Have skilled individuals maintain the turnstile according to a proper maintenance schedule In access control applications train all personnel that will be using the turnstile in the proper method o...

Page 4: ...of fire or shock replace with the same type and rating fuse b Label 3 the Warning Risk of Electric Shock WARNING For continued protection against risk of fire or shock replace with the same type and r...

Page 5: ...Channel Qty 1 10 32 x Allen Head Screw Qty 12 x 1 Hex Head Bolt Qty 2 10 x Phillips Pan Head Screw Qty 20 x 2 Anchor Bolt Qty 24 Flat Washers Qty 24 x 2 00 Concrete Anchors Qty 24 Top Bearing Cover Q...

Page 6: ...c come with key locks located on the underside of the Top Channel to allow key override control of the Roto Separate key overrides are provided for each rotation direction For manual units 3 models th...

Page 7: ...ere the turnstile will be installed Consider the overall footprint size of the unit when determining the installation location Figure 1 Once the installation location has been determined use a chalk l...

Page 8: ...chor into each drilled hole Figure 3 The threaded end of the anchor must be inserted into the hole first Use a hammer to tap the anchor into place if needed Ensure that the anchors are flush with the...

Page 9: ...or it with one x 4 anchor bolt and flat washer NOTE Prior to drilling the remaining anchor holes use a tape measure and measure the distance from the bottom bearing plate center to the remaining mount...

Page 10: ...liding the bottom bearing onto the mounting shaft Figure 11A Fig 11 Roto Installation Roto Section Bottom Bearing 11A Bottom Bearing Roto Mounting Shaft Collar Grease Fig 12 Bottom Bearing Bottom Bear...

Page 11: ...with both Roto cavities and carefully lower the Top Channel spline shaft into each cavity Figure 14A NOTE Apply grease to the end of the spline shaft before inserting 5 Once the Top Channel is seated...

Page 12: ...nd secure with four lock washers and four nuts Figure 15A 8 Hand tighten the Top Channel mounting hardware at this time Fig 16 13 Rungs 12 Rungs As viewed from the unsecured entry side NOTE For MSTT a...

Page 13: ...l not rotate When sliding the OV into place the Top Channel may need to be raised slightly 2 Align the two mounting holes on the OV with the two mounting holes on the Top Channel 3 Insert and hand tig...

Page 14: ...nd of the anchor must be inserted into the hole first Use a hammer to tap the anchor into place if needed Ensure that the anchors are flush with the concrete floor 9 Slide the OV backward exposing the...

Page 15: ...llustration and clarity purposes only the bearing cover illustrations are shown without the surrounding sections Screwdriver 10 32 Allen Head Screw Allen Wrench Top Bearing Covers NOTE The MSTT ships...

Page 16: ...on the inside of the top channel The key override switch manually unlocks the turnstile in the desired direction Key override switches are installed in the Top Channel on either side of the Roto To e...

Page 17: ...o each side of the Top Channel lid or conduit can be run to one side of the Top Channel lid and with connecting conduit between the two junction boxes In either case conduit must be run all the way to...

Page 18: ...he provided pig tail in the junction box and secure with wire nuts See Figures 26 for 110V 220V configurations 6 Tuck the excess wire into the junction box and re attach the junction box cover 7 Once...

Page 19: ...Optics Clockwise Fail Safe Counter Clockwise Fail Safe Timer See Chart to the Right Timer See Chart to the Right Feedback Pulse 300ms JS2 LED Option 1st Sensor Optics SW4 Layout 1 2 3 4 5 6 7 8 ON DIP...

Page 20: ...red light will be illuminated continuously J3 GND Ground Ground wire connection for OPN CLS lane control Left Hand Counter Clockwise Direction 0VDC 18mA Ground wire connection for OPN CLS passage cont...

Page 21: ...to Alvarado battery powered digital counter J5 Optical Sensors Connection for sensors 3 3VDC 16 5mA The ATC uses input from the sensors to monitor rotation of the Roto J11 CNT RESET Connection for co...

Page 22: ...tation Adjusts automatic re lock timing See Figure 27B for settings T3 T3ON Adjusts automatic re lock timing See Figure 27B for settings Adjusts automatic re lock timing See Figure 27B for settings T4...

Page 23: ...mmediately step into the turnstile Figure 28 Keeping your arms extended gently push on Roto arm section A and slowly walk through the turnstile Figure 28 Stay near the Yoke and take short steps Once y...

Page 24: ...the Alvarado recommended commercial products see Cleaning and Maintenance Section Stainless Steel units with optional coating wipe down entire turnstile with clean water Hot Dipped Galvanized wipe dow...

Page 25: ...ction FAIL SAFE FAIL LOCK CONFIGURATION Fail Safe Direction CW CCW A B C D E F G H I J K L M N O L K J I H F E C D B O O N N M M P P NOTES The steps contained in this Troubleshooting section are the m...

Page 26: ...with lock arm Adjust as needed Appendix D If the steps listed above did not solve the issue contact Technical Support Power Issues Cause Solution Reference Green LED is OFF 1 Verify that the power sw...

Page 27: ...ical sensors for a correct reading Fig 27 D F Fig 29 M Fig 29 M N Optical sensors are bad If the steps above did not resolve the problem the issue most likely lies with the optical sensors Please cont...

Page 28: ...ide will not engage Confirm key override is fully engaged with lock arm Adjust as needed Appendix D Electronic Issues Cause Solution Reference Optical sensors are dirty Use an alcohol moistened Q tip...

Page 29: ...th less effort NOTE If the distance is exceeded self centering may not operate correctly Issue Solution Reference Customer would like the turnstile to rotate with less pushing force The pushing force...

Page 30: ...t be used Rinse the surface after cleaning Damaged galvanized areas can be treated or touched up with zinc rich paint Use an organic cold galvanizing compound following the manufacturer s instructions...

Page 31: ...sivate stainless steel Alvarado recommends the use of a citric acid product CitriSurf2310 available from Stellar Solutions www citrisurf com This product is especially formulated to clean and passivat...

Page 32: ...G 0010 Multipurpose Grease 6 Months As required Solenoids Clean the solenoid plunger and solenoid cavity area using alcohol wipes and alcohol moistened Q tips Apply a light coating of DuPont Teflon N...

Page 33: ...te the grease fitting on the upper shaft bearing using the recommended grease and a grease gun Solenoid Spring Lock Arm Return Spring Fig 32 Self Centering Mechanism Figure 35 Clean and lubricate the...

Page 34: ...Installation section Fig A1 CPSTT Installation Instructions NOTE The overall height of the CPSTT is 91 5 However an additional 3 of clearance must be added for service and maintenance Yoke Half Sectio...

Page 35: ...els are in place mark each location Figure A5 Mounting Channel Yoke Outline Mounting Channels Mounting Hole Locations Pencil 4 00 8 00 CPSTT Installation Instructions Fig A6 A6A Concrete Drill Bit Con...

Page 36: ...t A6A Fig A7 16 9 Socket and Socket Wrench x 2 HHCS Bolt and Flat Washer Mounting Channel Mounting Channel Yoke Assembly Mounting Channel 20 x 1 screw Fig A8 Yoke Installation Cont Fig A8 8 Place one...

Page 37: ...ting channel 4 Secure each upper mounting channel to the Yoke using a 20 x 1 screw Figure A9 Inset 5 Tighten each screw using a Phillips head screwdriver 6 Repeat Steps 1 through 5 for the second Yoke...

Page 38: ...er to the Roto Installation to continue the installation CLSTT Illustrated Parts List Fig B1 These instructions are for installing the Yoke section of the CLSTT When complete please refer back to the...

Page 39: ...Fail safe Solenoid B Black Red Fail lock Solenoid CW Lock Arm A Return Spring B Solenoid Spring A B Black Silver 1 Spring Configuration 2 Solenoid Mount Position NOTE Spring Solenoid Operations are co...

Page 40: ...d B A A Return Spring B Solenoid Spring Black Red Black Silver CCW Lock Arm 1 Spring Configuration 2 Solenoid Mount Position 1 Spring Configuration 2 Solenoid Mount Position NOTE Spring Solenoid Opera...

Page 41: ...use with turnstiles that utilize fixed solenoid mounting positions 2 1 Spring Configuration 2 Solenoid Mount Position A Return Spring B Solenoid Spring CW Lock Arm Fail safe Solenoid A B Black Red Fai...

Page 42: ...use with turnstiles that utilize fixed solenoid mounting positions NOTE Bend lock arm tabs to mechanically adjust spring tension Increase spring tension Decrease spring tension Increase spring tension...

Page 43: ...e position Figure 3 2 Slide cam to engage the lock arm tab securely and completely tighten the mounting screw Cam Cam Shaft Lobe Setup CW Lock Arm Override Fig 3 NOTE If key cannot be removed or lock...

Page 44: ...1 1 Hold CCW lock arm open and rotate the key to the override position Figure 3 2 Slide cam to engage the lock arm tab securely and completely tighten the mounting screw Setup Cam Cam Shaft Lobe CCW...

Page 45: ...dded fire alarm system connection to turnstile control board section 1 6 11 10 15 A Flores SW4 DIP switch 8 configures OPN inputs as either normally open N O or normally closed N C Replaced Tri Flow L...

Page 46: ...10 Toll Free 800 423 4143 Fax 909 628 1403 information alvaradomfg com www alvaradomfg com 2014 Alvarado Manufacturing Company Inc This work may not be reproduced published or redistributed in whole o...

Reviews:

Related manuals for CLSTT-3