To start building your greenhouse begin by laying out the components for your sides flat on the
ground like the diagram below. Use the tables below to identify your building length and the
components with the part numbers and sizes. First of all drill pilot holes through the bottom of each
mortise on the cill section (diagram 3, page 9). Then slot each glazing bar into the mortise holes.
These are designed as a tight fit so you may need help with this or maybe use a solid object to push
against. Once firmly in position fix with the 50mm screw. Now slot the eaves rail into position (e.g.
EV0420). There is no need to fix this yet as it is done at a later stage.
Side Assembly
4
Part
Number
Size
(mm)
Qty
EV0015 1846 2
EV0418 1934 2
EV0501 1588 4
6ft long
Part Name
Cill
Eaves Bar
Glazing Bar
Part
Number
Size
(mm)
Qty
EV0016 2476 2
EV0419 2564 2
EV0501 1588 6
8ft long
Part Name
Cill
Eaves Bar
Glazing Bar
Part
Number
Size
(mm)
Qty
EV0017 3106 2
EV0420 3194 2
EV0501 1588 8
10ft long
Part Name
Cill
Eaves Bar
Glazing Bar
Part
Number
Size
(mm)
Qty
EV0018 3736 2
EV0421 3824 2
EV0501 1588 10
12ft long
Part Name
Cill
Eaves Bar
Glazing Bar
EV0017
EV0420
EV0501
Dia. 2
Dia. 3
EV0501
EV0501
Internal
EV0501
10ft
long
example
625m
m
EV0501
EV0501
Side glazing
bar orientation
TOP
BOTTOM
example
Summary of Contents for VICTORIAN CHELTENHAM 8x10
Page 1: ...07 14 09 14...
Page 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Page 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Page 63: ...63 Finished installation 17...
Page 66: ...66 Parts Lists See Universal booklet for part lists...
Page 67: ...67 Notes...