
32
Roof Assembly
9
Diagram 42
Diagram 43
With all the roof bars in place drill pilot holes vertically down through the roof bars, refer to diagram
27 (page 21) for the location of this hole. Make sure the roof bars are tight in to the eaves bar on the
inside of the building and fix with 100mm screws (diagram 42).
EV
047
7
Eaves
Bar
EV0501
EV0
47
7
Eaves
Bar
EV0501
100m
m Screw
Dia. 42
External
X-ray
Summary of Contents for VICTORIAN CHELTENHAM 8x10
Page 1: ...07 14 09 14...
Page 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Page 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Page 63: ...63 Finished installation 17...
Page 66: ...66 Parts Lists See Universal booklet for part lists...
Page 67: ...67 Notes...