![Alton VICTORIAN CHELTENHAM 8x10 Instruction Manual Download Page 33](http://html1.mh-extra.com/html/alton/victorian-cheltenham-8x10/victorian-cheltenham-8x10_instruction-manual_2912749033.webp)
33
Roof Assembly
9
Now all the roof bars are in
place and fully secured you can
fit the eaves bracing (EV0537M)
and ridge bracing (EV0538M).
These are fitted to every roof
and side bar in the building.
Use 40mm screws to fix these to
the building. (It looks better if
you have all the manufacturing
marks facing to the rear of the
building).
EV0537M
EV0538M
Diagram 44
Internal
Summary of Contents for VICTORIAN CHELTENHAM 8x10
Page 1: ...07 14 09 14...
Page 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Page 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Page 63: ...63 Finished installation 17...
Page 66: ...66 Parts Lists See Universal booklet for part lists...
Page 67: ...67 Notes...