21
Frame Assembly
7
Diagram 25
Make sure the side corner bar is located
correctly and the front face is flush with the
end of the eaves bar, mark out the pilot hole
positions shown in diagram 26 and 27.
Diagram 29 and 30 on the next page show the
direction the holes should be drilled in.
Diagram 24
Diagram 26
Diagram 27
19mm
30mm
EV04
01
EV0503
EV0503
EV
04
83
EV0415
EV0483
EV0503
80mm Sc
rew
EV06
12M
38mm
28mm
22mm
41mm
Keep faces flush
Eaves bar
Eaves bar
Top View
External Side
External Front
External
Summary of Contents for VICTORIAN CHELTENHAM 8x10
Page 1: ...07 14 09 14...
Page 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Page 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Page 63: ...63 Finished installation 17...
Page 66: ...66 Parts Lists See Universal booklet for part lists...
Page 67: ...67 Notes...