55
Roof Vent Installation
13
Now fit your autovents to the slam
rail and to the bottom of the roof
vents, diagram 65. Use 19mm
screws to secure the top arm of the
autovent to the roof vent, do this
with the roof vent in the closed
position so that you get the bracket
in the correct position.
Adjust the position of the lower arm
on the slam rail until the arms of the
autovent are parallel with the roof as
possible, then fix with 25mm screws.
NB. Disregard any fitting instructions
in the autovent box and any extra
plates or screws as these are for
other greenhouses. However you
should keep the leaflet as the
operating instructions are on there.
Diagram 65
Dia. 65
Internal
Summary of Contents for VICTORIAN CHELTENHAM 8x10
Page 1: ...07 14 09 14...
Page 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Page 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Page 63: ...63 Finished installation 17...
Page 66: ...66 Parts Lists See Universal booklet for part lists...
Page 67: ...67 Notes...