Roof Assembly
Diagram 37
You will need two sets of step ladders at this point and a
helper. Slot the ridge bar onto the tenons of the roof corner
bars at both ends of the building. The central glazing bars
should locate with the ridge bar below this joint (diagram 38).
Once in place still with your helper securing one end drill the
roof corner glazing bars as shown in diagram 37 to 40. The
pilot holes should be drilled horizontally and off centre as
shown so that the screw on the other side misses this screw. If
you always drill the holes for the roof bars 18mm from the left
hand side of the bar this will prevent any problems. Fix the
roof bars with 80mm screws (diagram 38).
57mm
18mm
Dia. 37
Summary of Contents for VICTORIAN CHELTENHAM 8x10
Page 1: ...07 14 09 14...
Page 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Page 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Page 63: ...63 Finished installation 17...
Page 66: ...66 Parts Lists See Universal booklet for part lists...
Page 67: ...67 Notes...