INSTALLATION
Deluxe Control Cook & Hold
▪
Operator’s Manual
▪
MN-46708
▪
Rev 1
▪
1/20
19
Continued from previous page
Continued on next page
Electrical
Alto-Shaam oven ratings
Breaker:
Voltage:
Phase:
Cord:
Plug:
Is the oven going to be hard wired?
Yes
No
The following fields must be completed by the service technician on site.
What is the measured voltage at the site?
L1-N:
L2-N:
L3-N:
L1-L2:
L2-3:
L1-L3:
Pass
Fail
What is the on-site breaker size supplying
power to the oven(s)?
Size:
Pass
Fail
Is there a disconnect or junction box within
3’ (914mm) of where the oven(s) will be
installed?
Pass
Fail
Comments:
Wifi equipped ovens
Is the Wifi system that be used secure, Wifi Protected Access 2 (WPA2)? The
Wifi system to be used cannot be Point of Sales Wifi.
Yes
No
Have you been provided the Service Set Identifier (SSID) for the system to be
used?
Yes
No
Have you been provided the pass phrase for the Wifi system to be used?
Yes
No
At the final location that the oven will be installed, can you connect to the Wifi
system with your phone?
Yes
No
At the final location that the oven will be installed, can you connect to Alto-
Shaam.com with your phone using the Wifi system?
Yes
No
Is site action required?
Yes
No
Action required:
Other site information
Is there a proper ventilation hood installed above where the oven(s) will be installed?
(If required)
Pass
Fail
Does the designated location for the oven have a level surface, i.e., no more than 1.5”
(38mm) change in elevation from its highest to lowest surface point?
Pass
Fail
Is the site 100% ready for oven(s) installation?
Pass
Fail
Is site action required?
Pass
Fail
Action required: