INSTALLATION
Deluxe Control Cook & Hold
▪
Operator’s Manual
▪
M N-46708
▪
Rev 1
▪
1/20
18
Pre-Installation Checklist
Installation of the oven is to be completed only by an authorized Alto-Shaam
service partner.
Place this form with the oven’s records.
Continued on next page
WARNING:
Electric shock and arc flash hazard.
Use caution when measuring line voltage and line current.
Wear Personal Protective Equipment (PPE).
Location Information
Installation date:
Start up date:
Location name:
Location address:
Contact name:
Contact phone number:
Number of ovens to be installed:
Contact email:
Oven model number(s):
IT Administrator name:
(if applicable)
Oven serial number(s):
Phone number:
Oven rated voltage:
Pre-Installation Company Information
Company name:
Mailing address:
Technician name:
Technician phone number:
Technician email:
Date of Site Survey:
Clearance
Record
Pass
Fail
Measure door/entry way clearance (smallest dimension)
Measure path clearance (smallest dimension)
Elevator opening, if applicable (smallest dimension)
Elevator interior dimensions, if applicable (HXWXD)
Oven Clearance Right side:
Rear:
Left side:
Top:
Based on the oven’s designated spot in the kitchen, is
the oven accessible for service?
Yes / No
If NO, comment on the issue:
Other comments: