area of use and  

heat source requirements

Taking into consideration the ambient conditions, limits 
of use and the relevant regulations, every heat pump can 
be used in new or existing heating systems.

  “Technical data / scope of delivery” overview,

Water temperature / Water quantity

The water in the extraction well of the heat source 
system must have a minimum temperature of 7 °c all 
year round and may not exceed a temperature of 25°c. 
depending on the heat output required or its cooling 
capacity as a relevant variable for dimensioning the heat 
source, a minimum water rate is required, which must 
be provided by the heat source as a continuous output. 
before installing the water/water heat pump, a pump test 
should/must be carried out for at least 12 hours with 
verification of a quasi-constantly lowered water table 
(persistence) in order to provide information about 
the quantity of water available. For efficient operation 
of the well, during the initial start-up the nominal flow 
rate must be adjusted on the heat source side. Any 
appropriate components, which enable balancing are 
to be installed in the pipe network here. The material 
of the components used must be chosen according to 
the water quality. The necessary flow rate (heat source 
water rate) must meet the heat pump's requirements.

  “Technical data/scope of supply” overview.

Water quality

In Germany the well must be designed and built to dIn 
4021 and vdI 4640 (in other countries according to the 
corresponding regulations). Wells may only be drilled 
and built by drilling companies with a permit in accord-
ance with dvGW W120. The water quality of the heat 
source is defined as normal groundwater. Ensure that 
the suction and return pipe always extends below the 
water level by sufficient depth, to ensure that oxygen 
is not added to the water (risk of iron oxide deposits). 
please discuss the problem of iron oxide deposits with 
your well builder. during the planning the quality of the 
groundwater should be checked in advance as well as 
possible (e.g. by asking the competent water authority 
or searching for data on existing adjacent wells) and sub-
sequently verified by water analysis in the built produc-
tion well. The following table helps to assess the water 
quality.

 

Important

 

A water analysis and pump test must be carried 
out before installing the water/water heat pump.

 note:

 

Water analyses are prepared by water test labo-
ratories. Initial information about possible use of 
groundwater is available from your local water 
management authority. A pump test provides 
information as to whether a sufficient quantity 
/ rate of water is available to cover the require-
ments for the heating output of your unit. The 
minimum groundwater flow rate must at least be 
available as a continuous output.

 “Technical data/scope of supply” overview, 

“Heat source flow rate” section.

evaluation of the Water analysis

Water constituents - minimum requirement. The water 
should be analysed in advance for the test values listed 
below (table). An important criterion to be used for 
taking water samples is the dvGW Standard, Technical 
notices, leaflet W 112 and use of the technical rules 
listed in it (dIn, En and ISo standards).

Designation

Limit

pH value

> 6.8

Iron level 

< 0.2 mg / l

Manganese level 

< 0.1 mg / l

Chloride level 

< 300 mg / l

Free chlorine level 

< 3 mg / l

Turbidity

none

Technical freedom 

from sand

< 0.1 mg / l sand per

10 l pumped water

 

Important

 

If a value does not conform to the value listed 
in the table, a water/water heat pump may not 
be used. direct operation of the unit in conjunc-
tion with surface water, wastewater, industrial 
wastewater or mixtures of water and alkali solu-
tions, acids or chlorine is also not allowed.

Summary of Contents for WWC100HX

Page 1: ...the right to modify technical specifications without prior notice 83050700aUK Translation of the operating manual Alpha InnoTec GmbH Compact Operating Manual Heat pumps Water Water UK WWC H X series W...

Page 2: ...always comply with the parameters for the respective model This operating manual is intended only for persons assigned to work on or with the unit Treat all constitu ent parts confidentially They are...

Page 3: ...overflow valve 19 Installing the control panel 20 Installation and removal of the screen 21 Domestic water heating 22 Domestic hot water tank 22 Commissioning 22 Safety temperature limiter 23 Dismant...

Page 4: ...ended use The con struction and design of the unit conform to current state of the art standards all relevant DIN VDE regulations and all relevant safety regulations Every person who carries out work...

Page 5: ...ervice always comply with the relevant local laws guidelines direc tives and standards concerning the recovery recycling and disposal of the operating materials and components of refrigerating units D...

Page 6: ...Ensure that the suction and return pipe always extends below the water level by sufficient depth to ensure that oxygen is not added to the water risk of iron oxide deposits Please discuss the problem...

Page 7: ...g windows for a short period two to three times a day reduces energy con sumption and your heating bill Care of the unit You can clean the outer surfaces of the unit with a damp cloth and proprietary...

Page 8: ...issioning Safety temperature limiter section Scope of delivery Example layout of the scope of delivery 1 Compact unit with hermetic compressor all safety relevant components for refrigeration circuit...

Page 9: ...lation The following applies to all work to be done Note Always comply with the relevant local accident prevention regulations statutory regulations guidelines and directives Note Note the sound infor...

Page 10: ...to installation location Warning The unit can tilt and tip over when being removed from the wooden pallet and dur ing transport This can result in personal injury and damage to the unit Take suitable...

Page 11: ...out any minor unevenness The Sylomer strips give the heat pump additional stability They absorb sound and vibrations transfer to the floor Place the Sylomer strips under the heat pump as fol lows Tilt...

Page 12: ...k whether the cross sections and lengths of the heat source pipes are adequately dimen sioned Note The heat source pump must be designed as a constant speed pump It must at least produce the minimum t...

Page 13: ...ctional and or buffer tank with volume 200 l always install an additional adequately dimensioned expansion vessel Thoroughly flush the heating circuit and heat source circuit before connecting to the...

Page 14: ...must be carried out by qualified electricians only Before opening the unit safely disconnect the system from the power supply and prevent it from being switched back on Warning During installation and...

Page 15: ...of the compressor can cause serious irreparable damage to the compressor Important Ensure the power supply of the heat pump is fit ted with a 3 pole miniature circuit breaker with at least 3mm contac...

Page 16: ...here is a threat of corrosion aluminium is attacked without the presence of oxygen Therefore apart from softening the heating fill and make up water the heating water should also be Flushing and filli...

Page 17: ...fore accelerate corrosion processes This can ultimately result in pitting On the safe side with low salt operation The problems listed above do not occur at all with low salt operation as the heating...

Page 18: ...View of inside of unit size 2 A B A 28kW unit B 44kW unit 1 Electrical switchbox 2 Overflow valve 3 Circulation pump heating circuit 4 Fill and drain tap heating circuit Bleeding the unit The unit is...

Page 19: ...late all connections vibration isolators con nections and pipes of the heating circuit and the heat source Insulate the heat source so that it is vapour diffusion tight Overflow valve Testing and sett...

Page 20: ...rom there This requires a shielded network cable category 6 to be laid through the unit during the electrical connection work Installing the control panel Danger Risk of fatal electric shock All elect...

Page 21: ...n Web server section If this network cable is available insert the network cable s RJ 45 connector into the left socket of the control panel Note The network cable can be exchanged at any time In orde...

Page 22: ...are optimally matched to your heat pump Note Integrate the domestic hot water tank in the heat pump system as shown in the hydraulic dia gram for your system Hydraulic connection documents Commission...

Page 23: ...Electrical work may only be carried out by qualified electricians Before opening the unit safely disconnect the system from the power supply and prevent it from being switched back on Warning Only qua...

Page 24: ...1 kg Additional weight module 2 kg Connections Heating circuit Heat source Refrigerant Refrigerant type Quantity kg Electrics Voltage code all pole circuit breaker heat pump A Voltage code circuit br...

Page 25: ...4 1600 3100 3900 0 55 2200 1 227 R 5 4 AG R 5 4 AG R407c 4 3 3 PE 400V 50Hz C13 1 N PE 230V 50Hz B10 3 N PE 400V 50Hz C16 3 27 6 0 0 79 9 4 28 20 9 6 3 0 17 n n 35l 1 5 813236 b WWC160HX 14 7 5 6 14 8...

Page 26: ...1 kg Additional weight module 2 kg Connections Heating circuit Heat source Refrigerant Refrigerant type Quantity kg Electrics Voltage code all pole circuit breaker heat pump A Voltage code circuit br...

Page 27: ...3 2x 11 8 22 20 0 39 n n 80l 1 5 813239 d WWC280X 27 0 5 1 27 0 5 2 20 60 7 25 47 60 5300 5300 9300 0 18 5300 Grundfos SP 8A 5 0 63 0 75 2 3 2 40 6 4 2300 4600 5800 0 4 3300 2 365 R 6 4 AG R 6 4 AG R4...

Page 28: ...35 C 50 C 65 C COP 1 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 0 1 2 3 4 5 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 0 0 5 1 0 1 5 2 0 2 5 3 0 p p bar 0 0 0 1 0 2 0 3 0 4 0...

Page 29: ...5 C 50 C 65 C COP 1 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 0 1 2 3 4 5 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 p p bar 0 0 0 1 0 2 0...

Page 30: ...C 50 C 65 C COP 1 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 2 3 4 5 6 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 p p bar 0 0 0 1 0 2 0...

Page 31: ...2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 2 3 4 5 6 7 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 p p bar 0 0 0 1 0 2 0 3 0 4 0 5 0...

Page 32: ...C COP 1 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 3 4 5 6 7 8 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 p p bar 0 0 0 1 0 2 0...

Page 33: ...OP 1 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 3 4 5 6 7 8 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 0 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 5 5 6 0 p p bar 0 0 0 1 0 2 0...

Page 34: ...1VD Vorlauf 50 C 1VD COP 2 3 4 5 6 7 8 5 10 15 20 25 30 Temp C Pe kW 2 4 6 8 10 12 5 10 15 20 25 30 Temp C p bar 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 1 0 1 1 1 2 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8...

Page 35: ...iew Item Designation Dim 1 Heating water inlet return flat seat G 1 1 4 2 Heating water outlet flow flat seat G 1 1 4 3 Heat source inlet at the unit flat seat G 1 1 4 4 Heat source outlet at the unit...

Page 36: ...Schutzvermerk nach DIN 34 beachten A B C D E F 4 3 2 1 a Zust nderungstext PEP 009 2006 M 001 2007 Legend UK819260a All dimensions in mm RH Minimum room height 2000 OKF Finished floor level FS Shaded...

Page 37: ...Rear view Item Designation Dim 1 Heating water inlet return flat seat G 1 1 4 2 Heating water outlet flow flat seat G 1 1 4 3 Heat source inlet at the unit flat seat G 1 1 4 4 Heat source outlet at th...

Page 38: ...m Designation Dim 1 Heating water inlet return flat seat G 1 1 4 2 Heating water outlet flow flat seat G 1 1 4 3 Heat source inlet at the unit flat seat G 1 1 4 4 Heat source outlet at the unit flat s...

Page 39: ...1 Schutzvermerk nach DIN 34 beachten A B C D E F 4 3 2 1 a Zust nderungstext PEP 009 2006 M 001 2007 Legend UK819260a All dimensions in mm RH Minimum room height 2000 OKF Finished floor level FS Shade...

Page 40: ...PE F12 2 N ZUP L3 Zubeh r Brauchwasser Umschaltventil Bezeichnung MOT 5 TBW PE A3 N A3 MA1 L3 VBO A2 Steuersignal zus tzlicher W rmeerzeuger 1 intern verdrahtet Steuerung 230V Klemmleiste in Schaltkas...

Page 41: ...1 Zubeh r Brauchwasserf hler thermostat TB1 VBO Steuerung 230V F11 A2 ZW2 SST X3 Klemmleiste in Schaltkasten W rmepumpe N PE Verteilung f r externe 230V Ger te Leistung Verdichter 3 x 400V Achtung Rec...

Page 42: ...A1 PE F12 2 N ZUP L3 Zubeh r Brauchwasser Umschaltventil Bezeichnung MOT 5 TBW PE A3 N A3 MA1 L3 VBO A2 Steuersignal zus tzlicher W rmeerzeuger 1 intern verdrahtet Steuerung 230V Klemmleiste in Schal...

Page 43: ...1 1 Zubeh r Brauchwasserf hler thermostat TB1 VBO Steuerung 230V F11 A2 ZW2 SST X3 Klemmleiste in Schaltkasten W rmepumpe N PE Verteilung f r externe 230V Ger te Leistung Verdichter 3 x 400V Achtung R...

Page 44: ...i Option W rmemengenz hlung eingebaut A6 TWA Y4 F hler Mischkreis 1 bei Option K hlung eingebaut DE817288b Zubeh r Raumfernversteller TVL W rmequelle Eintrittsf hler BWT R cklauff hler Brauchwasserf h...

Page 45: ...r Brunnenpumpe 3 N PE 400V 50Hz M3 K5 Verdichter 1 Klemmleiste in Schaltkasten W rmepumpe N PE Verteilung f r externe 230V Ger te Funktion 3 PE 400V 50Hz 3 Legende 3 N PE 400V 50Hz Sch tz Zusatzheizun...

Page 46: ...inspeisung Steuerung 1 N PE 230V 50Hz 1 EVU BUP Y1 Zubeh r Brauchwasser Umschaltventil 1 br Funktion Legende 3 sw Heizungspumpe Energieefizienz bei Option W rmemengenz hlung eingebaut bl bl M6 HUP X7...

Page 47: ...Thermostat R9 THG R5 Zubeh r Raumfernversteller TWA Kodierung W rmepumpe 3480 Ohm R10 Vorlauff hler W rmequelle Eintrittsf hler TA F hler Mischkreis 1 A6 TVL TBW Heissgasf hler Brauchwasserf hler Y4...

Page 48: ...zschalter Brunnenpumpe Klemmleiste in Schaltkasten W rmepumpe N PE Verteilung f r externe 230V Ger te F3 1 2 ZW1 X7 VD1 3 K1 2 Verdichter 1 3 PE 400V 50Hz 1 M1 Sch tz Verdichter 1 Legende 3 PE 400V 50...

Page 49: ...Schaltkasten W rmepumpe N PE Verteilung f r externe 230V Ger te 230VAC 1 Heizungspumpe entf llt bei Option W rmemengenz hlung Reglerplatine Achtung I max 6A 230VAC HDP 1 Niederdruckpressostat Legende...

Page 50: ...i Option W rmemengenz hlung eingebaut B2 Analog Ausgang 2 Heissgasf hler TWA A1 R7 TVL RFV Analog Eingang Funktion Y4 Brauchwasserf hler A1 Legende R8 R11 Reglerplatine Achtung I max 6A 230VAC CW TRL...

Page 51: ...400V 50Hz Sch tz Verdichter 1 Brunnenpumpe M2 3 3 N PE 400V 50Hz M1 F3 2 3 1 Funktion Legende Betriebsmittel VD1 VD1 Verdichter 1 Sumpfheizung Verdichter 2 2 DE817291b 3 PE 400V 50Hz Klemmleiste in S...

Page 52: ...rmepumpe N PE Verteilung f r externe 230V Ger te HDP bl Motorschutzschalter Brunnenpumpe 1 N PE 230V 50Hz K6 Durchflussschalter HUP rt K2 Niederdruckpressostat X7 M4 Energie Versorger Kontakt bei Fre...

Page 53: ...sgang 1 TBW R4 R7 Brauchwasserf hler TVL RFV A6 Legende BWT A1 Y4 R8 TRL CW Reglerplatine Achtung I max 6A 230VAC BWT Funktion W rmequelle Austrittsf hler R11 Y4 CW Analog Ausgang 2 A1 R13 W rmequelle...

Page 54: ...100 482 WWC 160H X 100 483 WWC 190H X 100 484 WWC 220H X 100 485 WWC 280X 100 486 WWC 440X 100 487 EC Directives Harmonised EN 2006 42 EC EN 378 EN 349 2006 95 EC EN 60529 EN 60335 1 2 40 2004 108 EC...

Page 55: ...urce connections mounted yes solar heat system no yes Solar heat system filled air free and sealed yes Frost protection inspected down to c Type of anti freeze agent please enter Hydraulic integration...

Page 56: ......

Page 57: ...for operation requested commissioning Ibn Art nr 16002101 Ibn p5 EW Art nr 16002501 Ibn 5 Art nr 16002201 Ibn Wp lG5 Art nr 16000901 Ibn 5 EW Art nr 16002301 Ibn l Art nr 16005001 Ibn p5 Art nr 16002...

Page 58: ...riestrasse 3 95359 Kasendorf Tel 49 0 9228 990190 Fax 49 0 9228 9906199 info alpha innotec com www alpha innotec com DK ASAP Energy Tinggaardvej 7 6400 S nderborg Tel 45 0 74 4304 80 Fax 45 0 74 4304...

Page 59: ...ww hydro tech pl PT GudEnergy Energias Renov veis Lda Av O S culo 21 r c D to 2135 231 Samora Correia Tel 351 0 263 652 727 Fax 351 0 263 652 526 info gudenergy pt www gudenergy pt SE Bj rneroth Tekni...

Page 60: ......

Reviews: