55
820522il FAZ-Wp AIT
© Alpha-InnoTec GmbH
The heating system is fi lled and pressure tested; the circulating pumps function properly.
no
yes
The heat source system is completed, inspected and oK.
no
yes
The heating circuit, heat source system and circulating pumps have been bled.
no
yes
All volume fl ows and water fl ow rates have been checked and are oK.
no
yes
checked on: .............................................................................
by: ...............................................................................................
Signature: ........................................................................................
The following applies in Germany and Austria:
Send this general checklist
along with the completed report
to the factory customer service.
Sending the general checklist and the completion report also serves as a request for a technician authorized by the manufacturer to
commission your heat pump.
for preparation of the Completion report
The general checklist is intended as an aid for the installation and assembly personnel. It makes no claim to be exhaustive.
nevertheless, all items must be checked carefully for compliance.
Heat source air
channels closed and sealed
yes
minimum cross-section is met
yes
Weather protection screen installed
yes
Rotary fi eld of fan
o.K.
Heat source brine / heat source water
Heat source volume fl ow
1
)
2
)
o.K.
motor protection setting
A
Rotary fi eld of heat source circulating pump
o.K.
Heat source fi lled, air-free and sealed
yes
Brine
Frost protection inspected down to
°c
Type of anti-freeze agent (please enter)
Water
Water quality oK
3
)
yes
Well units
yes
other heat source
yes
Heat pump
Installation of condensate hose
o.K.
decoupled from structure
yes
vibration decouplers of heating circuit and
heat source connections mounted
yes
solar heat system
no
yes
Solar heat system fi lled, air-free and sealed
yes
Frost protection inspected down to
°c
Type of anti-freeze agent (please enter)
Hydraulic integration
Integration of the heating heat pump into the
heating system corresponds to the planning
documents
yes
Shut-off devices are correctly set
yes
Heating
volume fl ow
1
)
2
)
o.K.
Heating system designed for maximum
°c
Heating system fi lled, air-free and sealed
yes
low temperature heating
yes
High temperature heating
yes
All heating circuits can be opened
yes
Forward fl ow tank
yes
Return fl ow tank
yes
Separating tank
yes
Additional heating
kW
Domestic hot water
Type: Hot-water tank (please enter)
4
)
with heat pump
yes
Request with thermostat
yes
Request with sensor
yes
volume fl ow
1
)
2
)
o.K.
connections sealed
yes
Exchanger area
m²
nominal contents
l
Electric fl ange heating
kW
Control / electrical connection
All electrical components are permanently
connected in accordance with the installation
and operating instructions and the require-
ments of the electricity supply company (not a
construction site connection)
yes
clockwise rotating fi eld observed
yes
All sensors are present and correctly installed
yes
1) checked with specifications.
•
2) The minimum volume flow must be
ensured through uncontrolled circulating pumps with constant volume
flows.
•
3)
Report of water analysis must be submitted
.
•
4) no functional
guarantee is given if tanks are used which are not made by Alpha-
InnoTec GmbH or are not approved for the heat pump type..
General checklist heat pump
We reserve the right to modify technical specifications without prior notice.
83050700aUK – Translation of the operating manual
© Alpha-InnoTec GmbH
General checklist