Tighten the union nut only as far as described
below.
1. Check pipe ends for scratches, dirt and
deformation.
2. Check proper position of the clamping ring on the
fitting.
3. Push the pipe through the clamping ring up to the
limit stop in the fitting.
4. Tighten the union nut hand-tight and attach
waterproof marking.
5. Tighten union nut with 3/4 rotation.
6. Check connection for leaks.
If the connection leaks:
1. Undo connection and check pipe for damage.
2. Tighten the union nut hand-tight and retighten with
the open-ended spanner with 1/8 to 1/4 turn, as
the clamping ring is already in a clamping position.
Heat pump installation instructions
Hydraulic integration documentation
The piping can be implemented on the right:
Or on the left
Always install the safety valve in the return line
(topmost pipe)!
The copper piping can be shortened but should not be
shorter than 250 mm from the centre of the bend!
min. 250
min. 250
min. 250
V
X
W
1.
Install shut-off devices in the heating circuit.
2. Insert the vent at the highest point of the heating
circuit.
3. Ensure that the max. working overpressures
(
“Technical data/Scope of supply” on page
23) are not exceeded.
Condensate connection
The outlet for the hot water safety valve and the
condensate from the air must be drained off in
accordance with the respective applicable standards
and regulations. Discharging the condensate and the
outlet for the safety valve into the sewers is permitted
only via a funnel waste trap, which must be accessible
at all times.