22
We reserve the right to modify technical specifications without prior notice.
83054300dUK
© ait-deutschland GmbH
Beginning first on one side and moving upwards,
lock the
screen's snap-in lugs in place
in the slots
provided on the front of the facade…
Next, on the opposite side, moving upwards.
lock the screen's snap-in lugs
in place
in the slots
provided on the front of the facade…
Finally, press the screen's upper snap-in lugs into
the slots provided on the front of the facade.
REMOVING THE SCREEN
In order to remove the screen, the snap-in lugs
must
first be loosened by pressing one side
completely
toward the middle of the screen
.
Thereafter, remove the snap-in lugs from the opposite
side.
Commissioning
DANGER!
The unit may be commissioned only with
the air ducts and weather grille or rain
guard installed and with the covers closed.
Proceed as follows:
Conduct a thorough installation inspection and go
through the items on the general checklist.
The installation inspection will prevent damage
to the heat pump system that could be caused by
incorrect installation work.
Make sure of the following…
•
Clockwise rotary field
of the load power
supply (compressor).
•
Installation and assembly
of the heat pump
according to the information in this operating
manual.
•
All electric installation work must be properly
completed.
•
A
3-pole automatic circuit-breaker
must be
installed for the compressor. It must have a con-
tact gap of at least 3 mm.
•
The heating circuit must be flushed, filled and
thoroughly bled.
•
All valves and shut-off devices of the heating cir-
cuit must be open.
•
All pipe systems and components of the system
must be sealed.
Carefully fill out and sign the completion report for
heat pump systems…
In Germany and Austria:
Send completion report for heat pump systems and
general checklist to the manufacturer’s factory cus-
tomer service department.
In other countries:
Send completion report for heat pump systems
and general checklist to the manufacturer’s local
partner.
Overview “Customer service”.