10
We reserve the right to modify technical specifications without prior notice.
83054300dUK
© ait-deutschland GmbH
Insert the pipes through the holes in the frame on
the switch cabinet side (= operator side)…
1 Holes in the frame
2 Inserted pipes
Make sure that pipes do not damage cable assem-
blies and components in the unit. Guide pipes care-
fully past cable assemblies and components in the
unit…
Guide pipes through the marked openings on the
back side of the unit…
Lift the unit on the pipes with at least four people
and carry it to its final installation location…
NOTICE.
Carry the unit horizontally and secure it against
slipping.
Put the unit in its final installation location. Make
sure that the frame of the unit is in full contact with
the underlying surface…
Remove the pipes and re-place the sealing grom-
mets on the back side of the unit…
If the electrical connections will not be carried out
directly thereafter, mount the lower facing panel on
the operating side.
1 Quick-release screws
2 Lower facing panel
Pull lower facing panel upwards and outwards,
detach and set securely to the side…
On the back of the unit, remove the sealing
grommet…